Galvanized Steel Sheet Construction Sign Av. Ec, Local Administration Av. Ec, Regularization And Compaction Of Predominantly Sandy Soil Subgrade. Af_11/2019 Av Ec, Concrete Guide (Curb), Molded In Place In Straight Section With Extruder, 15 Cm Base X 30 Cm Height. Af_06/2016 Av. Ec, Execution Of Flooring On Interlocking Floor, With Hexagonal Block Of 25 X 25 Cm, Thickness 8 Cm. Af_10/2022 Av. Ec, 04/10/2024, Execution Of Machined Concrete Gutter, Molded In-Situ In Straight Section, 30 Cm Base X 10 Cm Height. Af_06/2016 Av. Ec, Execution Of A Sidewalk (Sidewalk) Or Concrete Floor With Cast-In-Place Concrete, Made On Site, Conventional Finish, Thickness 6 Cm, Reinforced. Af_08/2022 Av.Ec, Subfloor In Mortar Mix 1:4 (Cement And Sand), Mechanical Preparation With 400 L Concrete Mixer, Applied In Dry Areas On Slab, Adhered, Non-Reinforced Finish, Thickness 4Cm. Af_07/2021 Av. Ec, Cemented Floor, Mixture 1:3 (Cement And Sand), Smooth Finish, Thickness 2.0 Cm, Mechanical Preparation Of The Mortar. Av. Ec, Aluminum Sheet Signaling Plate With Reflective Painting, E = 2 Mm Av.Ec, Galvanized Steel Tube With Seam, Medium Class, Grooved Connection, Dn 50 (2), Installed In Plumbs - Supply And Installation. Af_10/2020 Av.Ec, Horizontal Signage With Retroreflective Paint Based On Acrylic Resin With Glass Microspheres Av. Ec
|