The Subject Of The Order Is The Implementation Of Tasks In The Design And Build Formula: Securing The Ruins Of The Former Evangelical Church - 15Th/16Th Century In Wronińc By Designing And Implementing An Investment Task In The Town Of Wroniniec, Niechlów Commune, On Plot No. 96, In The Scope Of Works Securing The Ruins Of The Former Evangelical Church, I.E. Design Works And Construction Works , Renovation And Conservation Works. The Facility Is Entered Into The Provincial Register Of Monuments With Reference Number A/1112/815 Of December 16, 1960. Planned Scope Of Design, Construction And Conservation Works.1) Conservation Documentation And Laboratory Tests In The Field Of: A) Stratigraphic Tests For The Presence Of Historical Plaster Layers And Coatings Painting On The Walls Of The Perimeter Walls Of The Church And Tower. B) Archaeological And Architectural Research, Carried Out As Part Of Works Interfering With The Existing Ground And Floor Levels. 2) Design Documentation Required By Architectural And Construction Regulations To Obtain A Building Permit: A) Conservation Design (Pk), As An Attachment To The Application For A Conservation Permit. B) Plot Development Design (Pzd), For Plot No. 96. C) Architectural And Construction Design (Pab).D) Technical Design (Pt).E) Annexes And Arrangements Required By Law.3) The Construction Process Should Take Into Account, Among Others, That During The Works There May Be A Need To Conduct Architectural Tests Of The Facility, And In Connection Including: A) It Is Necessary To Take Into Account The Need To Change The Project In Connection With The Results Of The Research (Stratigraphic, Archaeological, Architectural And Anthropological), B) It Is Necessary To Display Possible Relics Of Old Architecture Of Earlier Construction Phases Of The Prepository, Historical Expeditions, Paintings, Etc. That May Be Discovered During Research Conducted Before And During The Renovation, C) Any Relics Necessary To Be Displayed Should Be Subjected To Conservation Based On A Conservation Work Program Developed By A Certified Conservator. D) Supervision Of The Above-Mentioned. The Work Should Be Carried Out By A Conservator Of Works Of Art With An Appropriate Specialization.4) Conservation And Construction Works: A) Dismantling The Existing Ivy From The Church Walls, Securing It For Later Use And Applying It To The Walls. B) Removal Of Self-Seeded Trees From The Interior Of The Church And From The Crown Of The Walls. C ) Removal Of Self-Seeding Trees From The Area Of The Former Cemetery, According To The Rules Specified In The Letters Of Dwkz Of April 7, 2023 And May 29, 2023. D) Permanently Securing The Remains Of The Burial Chapel, Located South Of The Church, Preventing Its Further Degradation. E) Protection And Maintenance Of The Perimeter Walls Of The Nave And Presbytery Of The Temple, Through Necessary Masonry Additions And Re-Brickwork In The Walls Of The Perimeter Walls Of The Church And Tower, In Order To Ensure The Stability Of The Structure And Protect It Against The Influence Of Weather Conditions. F) Renovation Of The Church Tower Along With The Renewal Of The Covering And Repair Of The Roof Truss , While Preserving The Original Elements Of The Structure As Much As Possible, And In Destroyed Places, Construction Works Should Be Of A Reconstruction Nature. G) Collection And Conservation Of Tombstones And Epitaphs Scattered Around The Church. H) Assembly And Exhibition Of The Above-Mentioned. Boards Inside The Ruins Of A Church.I) Repair Or Replacement Of Elements Of The Roof Truss On A Church Tower, Damaged By Atmospheric Factors, According To An Existing Pattern, Copying The Geometry And Structural Arrangement Of The Truss.J) Reconstruction Of The Roof Covering From Sheet Metal Along With The Necessary Sheet Metal Work, Restoration With Regulation Spire On The Tower.K) New Fence With An Entrance Gate On The Western Side, Along All Boundaries Of Plot No. 96.5) Completion Of Construction: A) As-Built Surveying Inventory. B) As-Built Conservation Documentation Of The Construction And Conservation Works Performed.
|