rv 5 Fodnes Tunnel . : __________Parts Of Existing Water And Frost Protection, The Aluminum Plate Vault Must Be Demolished And Replaced With New Water/Frost Protection. 2 New Accident Niches With Technical Buildings Are To Be Blown Up. The Tunnel Will Also Have New Lights Mounted On Cable Ladders. • Demolition Of Approx. 27,000 M2 Metal Sheet Vault • New Installation Of Approx. 30,000 M2 Of Water And Frost Protection • Clean And Secure The Rock Behind The Sheet Vault • Blasting Of 2 Emergency Niches With Technical Building • Blasting Of 4 Hanging Rock Rooms For Installation Of Ventilators • Delivery And Installation Of 2 Pieces Of Technical Building. • Deliver And Install Cable Ladder Through The Tunnel. • Dig A Trench And Lay A Draft Pipe Where We Replace The Water And The Frost Protection. • Install Approx. 6,200 Meters Of Slip-Cast Banquette Edge. • Concrete From The Existing Banquette And From The Concrete Foundation Under The Plate Vault Must Be Delivered To Muggeteigen For Processing. (Removal Of Reinforcement And Crushing). • The Mass From The Concrete Remains Must Be Used As Filling Mass/Backfilling Mass In The Tunnel.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79150154
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.