Coaching Services – Accompanying Process Ipa Coaching For Geolab. The Planned Geolab Research Infrastructure, An Underground Laboratory In A Mine, Is Intended To Answer Fundamental Questions Regarding The Development And Use Of Crystalline Reservoirs For Geothermal Energy. Geolab Enables A Wide Range Of Controlled High Flow Experiments, Experiments On Thermal-Hydraulic-Mechanical-Chemical Coupled Processes In Deep Geothermal Reservoirs And Research In The Field Of Reservoir Engineering. The Geolab Project Was Started On January 1, 2023 And, In Accordance With The Requirements Of The Federal Mining Act (Bbergg), Is Divided Into An Exploration Phase, A Construction Phase Of A Test Pit, Which Is Regulated In A Framework Operating Plan And Subordinate Operating Plans, And An Operating Phase Of The Test Pit. In The Exploration Phase, A Possible Location For The Underground Laboratory In The Odenwald In The Tromm Permit Area, Which Has Been Applied For, Is Currently Being Examined For Its Underground Properties For The Construction Of A Geothermal Test Pit. At The End Of The Exploration Phase, A Location Decision Is Made. If The Above Location Turns Out To Be Suitable, The Construction Phase Will Begin At This Location. If The Above Location Turns Out To Be Unsuitable, An Alternative Location Should Be Investigated. During Construction, The Access Road And Other Above-Ground Infrastructure, Including The Operations Building, As Well As The Test Pit With The Corresponding Scientific Monitoring Stations, Will Be Implemented. Geolab Should Be Built By The End Of 2029. The Operating Phase Then Follows. The Karlsruhe Institute Of Technology (Kit) Intends To Carry Out The Planning And Construction Phase Of Tunnel Construction As Well As Earthworks And Road Construction (Development) Using The Integrated Project Management (Ipa) Model. Excluded From The Ipa Project Are The Preceding Exploratory Measures And The Construction Of The Operational Building. The Support Of The Project By An Ipa Coach Is Divided Into Three Stages: 1St Stage Preparation And Partner Selection 2Nd Stage Validation Until Target Cost Agreement (Optional) 3Rd Stage Target Cost Agreement Until Commissioning (Optional) The Three Stages Are Based On The In Project-Defined, Project-Specific Framework Conditions And Are Currently Scheduled For The Following Durations (Subject To Change): 1. Stage I: 08/2024 - 01/2026 2. Stage Ii: 02/2026 - 10/2026 3. Stage Iii: 11/ 2026 - 12/2030 The Subject Of This Call For Proposals Is Ipa Coaching: Advice, Guidance And Support For The Entire Project Team For The Successful Implementation Of A Collaborative Project Culture That Enables The Team Members To Handle The Project In The Best Possible Way. The Project Should Be Carried Out Consistently In Accordance With Lean Management Aspects. The Ags Project Team Consists Of Around 10 People From The Operational Units And Service Units
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79137382
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.