The Subject Of The Order Is The Renovation Of Rooms In The Dormitory Building At The Special Educational And Educational Center In Jaworzno At 11 Wolności Street. The Renovation Will Include Replacing The Electrical Installation, Renovation Of Sanitary Facilities And Showers, Including Replacing The Water And Sewage Installations, Replacing Doors And Replacing Walls And Floors In The Building. Rooms And Communication. The Renovation Will Not Include Structural Changes. Execution Of Works In The Scope Of: 1) Construction: Demolition Works Include: - Replacement Of Internal Door Joinery, Demolition Of Partition Walls In Sanitary And Washroom Rooms In Accordance With The Design, Tearing Up Existing Floors And Screeds In Sanitary Rooms And Kitchen, Chipping Tiles In Sanitary Rooms And Kitchen On Walls Not Intended For Demolition, Tearing Off The Existing Pvc Floor Covering And Pvc Tiles In The Living Rooms And Corridors, Forging 1 Piece Of Internal Steel Door In The Corridor Between The Staircase And The Corridor (To Be Liquidated). Renovation Works Include: − Construction Of New Brick Partition Walls Separating New Shower Cabins And Vestibule Rooms In Sanitary Facilities, Execution Of Category Iii Plasters On The Walls, Covering The Walls With Tiles, Making New Screeds In The Rooms In Accordance With The Design, Repair Of Existing Screeds After Tearing Pvc Tiles And Pvc Floor Coverings, Not Intended For Demolition, Making New Floors With Stoneware Tiles Anti-Slip Surfaces, Making A Polymer-Cement Leveling Layer For Pvc Floor Coverings, Laying Pvc Carpets In Rooms In Accordance With The Design, Making Suspended Ceilings From Plasterboards In Accordance With The Design, Building Risers And Installation Connections With Gkfi Boards, Installing System Cabins In Toilets, Making Gypsum Plasters On Walls And Ceilings In Rooms, Emulsion And Oil Painting Of Walls And Ceilings, Painting Steel Doors In The Staircase With Oil Paint. The Subject Of The Order Does Not Include The Equipment Shown In The Architectural And Construction Design.2) Sanitary Installation: Demolition Works Include: - Dismantling Of The Water Supply System, Dismantling Of The Sanitary Sewage System, Dismantling Of Radiators. Construction And Installation Works Include: - Installation Of Cold Water Installations, Installation Of Hot Water Installations. , Installation Of A New Sewage System Within The Renovated Rooms, Installation Of Washbasin Faucets, Installation Of Washbasins, Floor Drains, Toilet Bowls, Shower Cabins, Installation Of A New Sewage System Within The Renovated Rooms, Installation Of A Cleaner, Installation Of Thermostatic And Shut-Off Valves, Installation Of Central Heating System Controls, Installation Thermal Insulation, Installation Of Fans And Hood, Installation Of A Radiator.3) Electrical Installation: Demolition Works Include: - Disassembly Of Worn-Out Installations And Electrical Equipment As Well As Lighting Fixtures, Construction And Installation Works Include: - Installation Of A New Trg Main Electrical Switchboard, On The Ground Floor Of The Building In The Room Porters Lodge In The Internat Part, Installation Of An Electrical Switchgear Serving The Ground Floor - Tb-3, Installation Of Electrical Switchboards Serving The First Floor - Tb-4, Tb-5, Construction Of New Electrical Circuits - Wlz For Switchboards, Connection Of An Emergency Lighting Luminaire Circuit On The Ground Floor And First Floor For Communication Lighting Circuit Switchboards, Connecting The Emergency Lighting Luminaire Circuit In The Basement To The Existing Switchboard Serving The Basement, Equipping With Overvoltage Protection Protective Devices, Equipping With Residual Current And Overcurrent Protective Devices, Equipping With Anti-Shock Protection Devices, Construction Of A New Lighting Installation On The Ground Floor And First Floor, Installation Lighting Fixtures And Electrical Equipment, Performing Anti-Shock Protection Measurements, Performing General Lighting Intensity Measurements, - Drilling Holes Through Walls And Ceilings, Digging Furrows, Blind Holes For Electrical Installation Equipment, Laying Electrical Installation Cables, Carving Recesses For Electrical Switchboards, Mortaring Furrows And Piercing Through Ceilings And Walls, Laying Of Cables And Electrical Power Supply Wires - N2xh-J, Flame-Retardant, Installation And Fastening Of Electrical Switchboards, Installation Of Electrical Devices In Switchboards: 4-Pole Fr 304/100A/40A Switch Disconnectors, Surge Arresters, Ac Type Residual Current Protection, Overcurrent Protection S303, S301, Phase Control Indicators, Bistable Relays, 1 And 3 Phase Contactors 25A, 230Vac, Installation Of Lighting, Emergency And Evacuation Fixtures, Installation Of Electrical Equipment, - Carrying Out Grounding Measurements, Measuring The Insulation Resistance Of Electrical Circuits, Power Lines And Outgoing Circuits, Continuity Testing Protective Conductors And Anti-Shock Protection, Testing Of General Lighting Intensity And Reports On The Tests And Measurements Carried Out, - Quality Control Of Materials, - Quality Control Of Works. In Accordance With: 1) Land Development Project: Renovation Of Rooms In The Boarding House Building In The Special Educational And Educational Center Constituting Appendix No. 1 To Swz2) Architectural And Construction Design: Renovation Of Rooms In The Dormitory Building In The Special Educational And Educational Center Constituting Appendix No. 2 To Swz3 ) Technical Design Of The Structure: Renovation Of Rooms In The Boarding House Building In The Special Educational And Educational Center Constituting Appendix No. 3 To Swz4) Technical Design - Electrical Industry: Renovation Of Rooms In The Dormitory Building In The Special Educational And Educational Center Constituting Appendix No. 4 To Swz5) Design Technical Sanitary Industry: Renovation Of Rooms In The Dormitory Building In The Special Educational And Educational Center Constituting Annex No. 5 To Swz6) Technical Specification For The Execution And Acceptance Of Construction Works: Renovation Of Rooms In The Dormitory Building In The Special Educational And Educational Center - Construction Industry, February 2024 . Constituting Annex No. 6 To Swz7) Technical Specification For The Execution And Acceptance Of Construction Works: Renovation Of Rooms In The Dormitory Building At The Special Educational And Educational Center - Sanitary Industry, February 2024. Constituting Annex No. 7 To Swz8) Technical Specification For The Execution And Acceptance Of Construction Works: Renovation Of Rooms, Replacement Of Electrical Installations In The Sosw Building, Part Of The Dormitory On The Ground Floor And First Floor - Electrical Industry, February 2024, Constituting Annex No. 8 To Swz2. The Ordering Party Provides Information On The Bill Of Quantities As An Aid In Preparing The Offer Price By The Contractor.2.1. Bill Of Quantities Renovation Of Rooms In The Dormitory Building At The Special Educational And Educational Center - Construction Industry, February 2024. Constituting Annex No. 9 To Swz2.2. Bill Of Quantities Renovation Of Rooms In The Dormitory Building At The Special Educational And Educational Center - Sanitary Industry, February 2024. Constituting Annex No. 10 To Swz2.3. Bill Of Quantities Renovation Of Rooms, Replacement Of Electrical Installations In Part Of The Sosw Dormitory In Jaworzno - Electrical Industry, February 2024. Constituting Annex No. 11 To The Swz
|