Lot 1 - Mechanized Trench Embankment With Hydraulic Excavator (Bucket Capacity: 0.8 M³ / Power: 111 Hp), Width Up To 2.5 M, Depth From 1.5 To 3.0 M, With Clay-Sandy Soil. Af_08/2023, Lot 1 - Opening And Sealing Cracks In The Floor For Structural Recovery, Lot 1 - Demolition Of Simple Concrete Floor, Manually, Without Reuse. Af_09/2023, Lot 1 - Groute Fgk=30 Mpa, Mixture 1:0, 02:0, 9:1, 2 (In Dry Mass Of Cement/ Lime/ Coarse Sand/ Crushed Stone 0) - Mechanical Preparation With 400 L Concrete Mixer. Af_09/2021, Lot 1 - Surface Waterproofing With Polymer Mortar / Acrylic Membrane, 4 Coats, Reinforced With Polyester Veil (Mav). Af_09/2023, Lot 1 - Floor Painting With Acrylic Paint, Manual Application, 2 Coats, Including Primer. Af_05/2021, Lot 1 - Opening And Sealing Cracks In The Floor For Structural Repair, Lot 1 - Demolition Of Simple Concrete Floor, Lot 1 - Surface Waterproofing With Cement Mortar And Sand, With Waterproofing Additive, E = 1 , 5Cm. Af_09/2023, Lot 1 - Surface Waterproofing With Acrylic Resin-Based Membrane, 3 Coats. Af_09/2023, Lot 1 - Standard Acrylic Latex Paint, Manual Application To Ceiling, Two Coats. Af_04/2023, Lot 1 - Opening And Sealing Cracks In The Wall For Structural Recovery, Lot 1 - Demolition Of Holed Block Masonry, With Reuse. Af_09/2023, Lot 1 - .Graute Fgk=30 Mpa, Lot 1 - .Impermeabilizimpermeabilização Surface With Polymeric Mortar / Acrylic Membrane, Lot 1 - Premium Acrylic Latex Painting, Manual Application On Walls, Lot 1 - Rectangular Drain, In Masonry With Concrete Blocks, Internal Dimensions: 1.0 X 3.0 X H=3, Infiltration Area: 25 M² (For 10 Contributors). Af_12/2020, Lot 1 - Reinforced Concrete Cover For Well, With Hole And Cap, D = 2.50 M, E = 0.05 M, Lot 1 - Pvc Tube, Normal Series, Building Sewer, Dn 100 Mm, Supplied And Installed In Sanitary Sewer Or Ventilation Plumbing. Af_08/2022, Lot 1 - Mechanized Trench Backfilling With Backhoe Loader (Retro Bucket Capacity: 0.26 M³ / Power: 88 Hp), Width Up To 1, Lot 1 - Mechanized Trench Excavation With Prof. From 3.0 M To 4.5 M (Average Upstream And Downstream/One Composition Per Section), Excavator (1.2 M3), Width. From 1.5 M To 2 M, On 1St Category Soil, In Locations With A High Level Of Interference. Af_02/2021, Lot 1 - Loading, Maneuvering And Unloading Of Rubble In A 10 M³ Dump Truck - Loading With Hydraulic Excavator (0.80 M³ / 111 Hp Bucket) And Free Unloading (Unit: M3). Af_07/2020, Lot 1 - Removal Of Metallic And Ceramic Fiber Cement Tiles, Lot 1 - Roofing With Corrugated Fiber Cement Tile E = 6 Mm, With Side Coverage Of 1 1/4 Wave For Roofs With A Maximum Slope Of 10°, With Up To 2 Waters, Including Lifting. Af_07/2019, Lot 1 - Support For 150 Mm Gutter In Galvanized Iron, Lot 1 - 16/18 W T8 Tubular Fluorescent Lamp, Bivolt, Lot 1 - Surface Cleaning With High Pressure Jet. Af_04/2019, Lot 1 - Planting Batatais Grass On Plates. Af_05/2018, Lot 2 - Door Removal, Lot 2 - Set Of Chromed Hardware For Tempered Glass Door, One Leaf Composed Of Top And Bottom Hinges, Latch, Lock, Counter Lock With Springless Hood And Handle. Af_01/2021, Lot 2 - Ready-Made Wooden Door Kit In White Melamine Finish, Light Or Medium Foil, 70X210cm, Exclusive Lock, Fixing With Partial Ex Foam Filling
|