Railway Construction Works – Exchange Of Switches. The Project Concerns The Exchange Of A Total Of 14 Switches In Korsør And Nyborg, While An Existing Switch In Korsør Needs To Be Adjusted. The Execution Of The Works Is Divided Into The Following Three Sections: Korsør East, Korsør West And Nyborg. At Korsør East And Korsør West, 6 Switches Must Be Exchanged On Each Section, While In Nyborg 2 Switches Must Be Exchanged. The Scope Of The Sub-Sections Consists Of The Following: - Corsør East: Km. 107.589 – 107.991. - Korsør West: Km. 109,006 – 109,391. - Nyborg: Km. 130,144 – 130,270. The Overall Scope Of The Exchange Work Regarding The Switches Covered By The Above Sections Consists Of The Following: - In Korsør East, Six (6) Switches Must Be Exchanged (Switch 11, Switch 12B, Switch 13A, Switch 13B, Switch 14A And Switch 14B), While The Existing - The Switch 12A Must Be Adjusted. - In Korsør Vest, Six (6) Switches Must Be Exchanged (Switch 01A, Switch 01B, Switch 02A, Switch 02B, Switch 03 And Switch 04). - In Nyborg, Two (2) Switches Must Be Exchanged (Switch 14A And Switch 14B). The Current Switches At Korsør And Nyborg St. Must Be Exchanged For Tsi Switch (Tsi-60E2-R500-1:14). All Switches Are To Be Exchanged From Wooden To Concrete Sleepers, While Rails Remain Of Type Uic60. During The Exchange Of All Switches, All Track Boxes Must Also Be Replaced. In Addition To The Works Relating To The Exchange Of Switches And The Replacement Of Track Boxes, The Following Works Must Also Be Carried Out: - Track Works. - Earth And Ballast Works. - Drainage Works. - Works In Connection With Cable Rerouting And Routing. - Transitions (Cts Composite). - Conductor Works. - Fuse And High Current Work. - Works In Accordance With Environment And Disposal Of Residual Products And Waste. - Works In Accordance With Obtaining Authority Permits. - Administration And Workplace. - Any Option Works, Cf. The Description In The Tender Notice On Options. In Addition To The Above Works, Various Works Called Modification Services Can Also Be Carried Out. These Include The Following: - Moving The Fixed Point. - Crab Measurements Of Tracks. - Tv Inspection With Push Camera Of Drainage Lines, Sewers, Etc. - Installation And Rigging Of Bilge Pump. - Cold Direction Of Derailleur Tongues. - Establishment Of Cable Duct Underpasses In Connection With New Track Box. - Removal Of Large Objects, Cable Wells, Etc., Including Excavation, Removal, Loading And Transport As Well As Disposal Of Occupied Wells And Materials, Excavation, Transport And Deposit Of Excavated Soil As Well As Land Reclamation. - Delivery, Installation, Rental And Removal Of Road Plates. - Delivery, Installation And Removal Of Click Pipes On Existing Cables, Incl. Excavation Work. - Removal Of K0 Soil. - Construction Of Raw Soil Planum. - Cable Search. Man-Hours And Material Are Also Included In Carrying Out The Change Services. Before Starting The Exchange Of The Switches, The Winning Tenderer Can Carry Out The Preparation
|