Structural Shell Work – Renovation Of School Building, Maxim-Gorki-Str. 67, 18106 Rostock - Lot 302 Shell Construction Work. The Service Includes, Among Other Things, - 25 Months Of Construction Site Setup - 300 M Construction Fence, Steel Frame (Mobile), H = 2.00 M - 3 Pieces Of Jamming Protection And Ceiling Support, Stairwell - 10 Pieces Of Door Openings In The Inner Wall 0.885X2.01 M; 1.01 Mx2.01 M - 14 Stair Flights + 6 Intermediate Landings Dismantled - 960 M³ Construction Pit Excavation, Contaminated, Class 3-5, Dispose Of - 150 M³ Lean Concrete C12/15 - 75 M³ Strip Foundations - 345 M² Fresh Concrete Composite Film - 260 M² Floor Slab C25 /30, Stb, Wu, With Formwork, D=25 Cm - 600 M² Reinforced Concrete Outer Wall, C25/30, Stb, Smooth, D=24 Cm - 234 M² Roof Ceiling, Stb, With Formwork, D=12 Cm - 65 M² Reinforced Concrete Inner Wall, C25/30, Stb, Smooth, D=24 Cm - 160 Pieces Of Halfen Rails Hta 28/15 - 100 M² Main And Intermediate Landings, In-Situ Concrete, D=22 Cm - 12 Pieces Of Prefabricated Staircase With 11 Steps - 345 Linear Meters Of Groove, Bituminous - 250 M Reinforcement Rebending Connections, 8/15, Wall Thickness 25 Cm - 20 T Reinforcing Steel Bars Bst 500 S (A) - 20 T Reinforcing Steel Meshes Bst 500 M - 1 T Structural Steel Mesh Support Baskets - 6 Pieces Hea 160 - 2 Pieces Heb 180 - 220 M² Ks Masonry , D=17.5 Cm - 50 M² Ks Masonry, D=24 Cm - 35 M² External Wall Ppw 4-0.6 In Thin Bed - 490 M² Lime Cement Plaster Inside - 135 M² Gypsum Plaster Inside - 20 Pieces Of Mounting Supports Eurex 30 - 350, Incl Head And Foot Thresholds - 400 M² Facing Shell Masonry, Khlz-B-28-1.8/Iia - 420 M² Graffiti Protection - 300 Linear Meters Of Artificial Stone Slabs 350/350/65 Mm As Eaves Strips - 1 Piece Of Prefabricated Garage
|