Tenders Are Invited For Transformer Substation – Study, Supply Of Equipment And Turnkey Construction Of The ...
Tender Notice
TenderID
79059956
Tender Brief
Tenders Are Invited For Transformer Substation – Study, Supply Of Equipment And Turnkey Construction Of The New Distribution Center (C/D) Closed Type Gis Chania Ii And Mt Connection Building
Transformer Substation – Study, Supply Of Equipment And Turnkey Construction Of The New Distribution Center (C/D) Closed Type Gis Chania Ii And Mt Connection Building. The Main Elements Of The K/D Equipment Are As Follows: • The Main Electrical Equipment On The 150 Kv Side Will Consist Of 150 Kv Indoor Type, Sf6 Gas Insulated Under Pressure (Gis), 2000 A Double Busbar Switchboards, And Will Include Two (2) Line Fields, Three (3) M/S Power Fields, One (1) Busbar Coupling Field And One (1) Measurement Field. • Three M/S (3) Power 40/50 Mva And The Corresponding Mv Equipment. Which Will Consist Of Metalclad Panels With Air Insulation, 1. The Entire Power Equipment Will Be Installed In A Closed Building With A Suitable Layout. Bidders Are Allowed To Submit Their Own Layout Designs For Review. In Any Case, The Project Contractor Will Prepare And Submit For Approval Detailed Construction And Operational Plans, Which, However, Should Not Alter The Basic Architectural Features Of The Proposed Building (External Dimensions / Shape Of The Indicative Plans, Location Of The Building With Lateral Distances Of The Fence) And The Basic Design Principle Must Be Satisfied According To Which The Entrance To The Areas Of The Power M/S, The Yt Gis, The Mt Panels And The Control Room Will Be From A Main Corridor Of The Building And Not Through Other Premises With Installed Equipment. 2. The Complete Construction Of The M.T. Link Building, Which Will Be Built Outside The Boundaries Of The K.D. Field, Is Also The Contractors Obligation. And At A Distance Of 25M From It And The Double Underground Mt Line From K/D To The Mt Junction Building. 3. The Detailed Characteristics Of The Project And Its Required Specifications Are Analyzed In The Attached Issues Of The Declaration. 4. All The Necessary Investigations To Establish The Characteristics And Determine The Data Required For The Correct Design And Study Of The Project Are Part Of The Contractors Obligations, Such As E.G. Geotechnical Investigation For The Correct Seating And Static Adequacy Of The Constructions In Permanent As Well As In Seismic Stresses, Investigations Of Electrical Characteristics Of The Soil, Etc. The Geotechnical Study For The Assessment Of The Soil Will Be Prepared By The Contractor. The Contractors Obligations Also Include Obtaining The Required Permits From The Competent Authorities For The Construction Of The Project. It Is Pointed Out That For The Said K/D No Building Permit Is Required From The Relevant Building Service, But The Permits Will Be Issued By The Competent Departments Of The Gen. 5. The Individual Works Of The K/D Will Be Carried Out In A Way To Ensure The Delivery And Operation Of The Project Without Delay And With The Least Disturbance To The Operation Of The Existing Network. Also, The Adjacent Naval Facilities, As Well As The Shipment, Within The Crete Navy Station, Must Not Be Obstructed. 6. The Contractor, As Well As Any Subcontractors, Are Obliged To Comply With The Provisions Of The Legislation On The Health And Safety Of Workers And The Prevention Of Occupational Hazards
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 79059956
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.