The Project Consists Of Joining The Existing Apr Santa Barbara Network Where A Metering Frame Is Connected, From There Water Will Be Stored In 2 5400 Liter Ponds And Water Will Be Distributed Through 75Mm Hdpe Pipe At Ground Level On The Edge Of The Route 7, An Approximate Pipeline Length Of 4900 Meters. 26 Home Starts Are Contemplated To Benefit The Residents Of The Sector
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78982034
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.