Railway Tunnel Construction Work – New Construction Of The Cornberger Tunnel - Ve01 Main Construction Work. Ve01 Main Construction Work: New Construction Of A Double-Track Tunnel Using Mining Construction (L=681 M) In A Parallel Position To The Existing Tunnel In Operation, New Construction Of Two Portal Structures (Bored Pile Wall Construction), Earthworks, Two Pre-Cuts, Construction Of A Rescue Area And Two Access Roads, New Construction Of An Extinguishing Water System Including An Underground Extinguishing Water Tank, New Construction Of Cable Routing Systems Incl. Crossings Throughout The Entire Project Area (Approx. 6 Km On Both Sides Of The Railway), Cable Pulling Work, New Construction Of Foundations For Signals And Overhead Line Masts, New Construction Of A Concrete Switch House, New Construction Of Six Stair Structures, Brickwork Of A Culvert, Extension Of A Noise Barrier, New Construction Of A Dam, Edge Paths
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78961738
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.