Drinking-Water Treatment Plant Construction Work – Construction Of A Water Treatment Plant At The Brunnenfeld Reisenberg Site. Mael Services For The Construction Of A Water Treatment Plant At The Brunnenfeld Reisenberg Site, Lower Austria. The System Consists Of The Following System Parts And The Following General Conditions Must Be Observed. 1 Water Extraction From Existing Evn Wasser Wells. Total Amount Of Raw Water: 140L/S. 2 Raw Water Storage Tanks, The Raw Water From The Wells Is Mixed In Raw Water Storage Tanks. 3 Pressure Increase, For Both The Membrane And The Activated Carbon System. 4 Pre-Filtration With A Filter Fineness Of At Least 20Μm. 5 Co2 Dosing 6 Dosing Device For Antiscaling Agents 7 Membrane Filtration System The System Consists Of: 7.1 Fine Filtration 7.2 Pressure Increase For Reverse Osmosis 7.3 Pressure Pipe Racks For Reverse Osmosis 8 Control 9 Cip Cleaning-In-Place Facilities 10 Permeate Flushing Device 11 Activated Carbon Filtration 12 Blending 13 Degassing, Deacidification (Flatbed Degasser) 14 Pure Water Basins 15 Pure Water Pumping Station 16 Uv Disinfection System 17 Measuring Devices 18 Wastewater Discharges
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78961344
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.