Construction Work For Pipelines, Communication And Power Lines – Szombathely North 132 Kv Transmission Line Construction. Construction Of Szombathely-Észak 132 Kv Transmission Line As Part Of A Business Contract. The Task Of The Winning Tenderer Is To Establish The Szombathely Vépi Út - Szombathely North, Szombathely North - Csepreg 132 Kv Transmission Line And Communication Connection (Overhead And Ground Cable Sections). E.On Észak-Danunátúli Áramhálazóti Zrt., As The Bidder, Is Planning The Construction Of High-Voltage Electric Transmission Lines Within The Framework Of The Danube Ingrid Project. Due To The Need For Additional Power Of Large Consumers In And Around Szombathely And To Ensure The Energy Needs Of New Industrial Facilities, The Development Of The Electricity Supply In The Area Is Justified, In Order To Achieve This Goal, The Szombathely Vépi Út-Csepreg 132 Kv Transmission Line Will Be Installed Between The Poles 1-2 Of The 1/1 Tensioning Pole To The Newly Established Szombathely Észak 132/22/11 Kv Substation (Hrsz 16948) Approx. It Intends To Build An 8.6 Km Long, 132 Kv Transmission Line Section. Within The Framework Of The Contract To Be Concluded As A Result Of A Public Procurement Procedure, It Intends To Implement The Construction Of An Approximately 8.6 Km Long 132 Kv Transmission Line Section In The Inner And Outer Areas Of Szombathely, Which Will Cover An Approx. 3.75 Km Underground Cable And An Approx. It Consists Of A Free-Wire Section Of 4.84 Km. The Planned 132 Kv Transmission Line Runs On A New Two-System 132 Kv Pole Line, Belonging To The Budapest Pole Family, Between End-Tensioning Pole No. 1/1 And End-Tensioning Podium Pole No. 17. Columns 11 And 12 Must Be Designed In Such A Way That The Söpte Industrial Park Can Be Split Between The Columns Without Conversion. The Overhead Line Section Ends At The End-Tensioning Podium Column Number 17, From Here To The Newly Established Szombathely North 132/22/11 Kv Substation Approx. The Planned Route Will Be Built With A 3.7 Km Long Dual-System Naf Cable. Main Types Of Work And Tasks: - Column Foundation Work (17 Pieces) - Concreting, Formwork, Smoothing, Tamping, Earth Excavation, Earth Backfilling, Earth Removal, Rebar Installation In The Quantities And Units Of Measurement According To The Detailed Budget. - Column Installation - 17 Pieces, Total 115,950 Kg. - Insulators, Protective Conductor Assemblies, Optics - According To Bill Of Materials - Wiring - 250/40 Acsr: 5082 M, 59/25 Opgw: 5082 M, 50/30 Acsr: 5082 M. - Naf Cable And Fittings: Design Of 2 X 3,750M, Cable Laying And Installation, Connection On The Podium, Other Costs - According To The Bill Of Materials. - Naf Cable Auxiliary Materials And Fittings - According To Bill Of Materials. Transmission Line Name: System I: Szombathely Vépi Út - Szombathely North Ii. System: Szombathely Észak-Csepreg The Route Of The Newly Established, Two-System Overhead Line Crosses Fields In The Outskirts, Its Length Is Approx. 4840 M, And Budapest Ii. It Is Realized With 9 Supporting And 8 Tensioning Columns Belonging To The Column Family. Nominal Voltage: 132 Kv Type Of Current: Three-Phase, Alternating Frequency: 50 Hz Current Conductor: 2X3x250/40 Acsr Protective Conductor: 1X50/30 Acsr + 1X59/25 Opgw (48 Strands) Columns: Budapest Ii.1 And Budapest Ii.2. Dual System
|