Roadworks – 1-W-32317-23: Redevelopment Of Hofplein Rotterdam (Nl). Carrying Out Railway, Paving, Sewerage And Other Additional And Associated Work For The Redesign Of The Hofplein In The Stadsdriehoek District In The Municipality Of Rotterdam. The Aim Of The Redevelopment Of The Hofplein Is To Create An Urban Multifunctional Space With A Strong Rotterdam Identity, In Line With The Wishes And Challenges Of Our Time. The Hofplein Must Become A Link To Improve The Quality Of The City Center, By Offering A Better Quality Of Stay, Making The Environment More High-Quality For Visitors, Residents And Office Users. Hofplein Is An Important Access To The Core Shopping Area And Is Located In The Middle Of The Citys Main Office Area And Fits In With The Ambition To Establish (International) Head Offices In The Central Business District. A Better Hofplein Also Ensures A More Attractive Tourist Climate, Especially If The Relationship Is Made With The Hofboogs, The Westblaak And The Schouwburgplein. The Development Of The New Hofplein Also Contributes To The Economic Development Of The City Center And The Consolidation Of The Local Job Engine. The Current Layout Of The Hofplein Is Based On Optimal Traffic Flow, But Offers Few Options For Accommodation, Greening, Climatic Improvement And Environmental Aspects. To Make Room For This, An Integral Change At System Level Is Needed In Which The Traffic System Strikes A Better Balance With The Citys Other Tasks. This Fits Within The Vision Of Public Space (2019-2029) And Is Made Possible By The Rotterdam Mobility Approach (Rma), A Green And Sustainable City With Public Space Of And For Everyone And More Space For Cyclists And Pedestrians Is Made Possible Because The City Center Is No Longer Intended For The Car To Traverse, But Where The Pedestrian Comes First, Followed By Bicycle, Public Transport And Car. It Is A Task In Which Technology, Mobility, Use, Management, Local Employment And Climate Adaptation Must Be Approached Integrally With The Aim Of Creating A Square With A Vital Urban Character And A Powerful Rotterdam Identity That Contributes To A City Center That Invites People To Meet And Interact. Stay. The Course Of The Project Can Be Divided Into 3 Different Project Parts, All Of Which Are Integral To These Assignments. - I. Joint Work Preparation; - Ii. Realization; - Iii. Maintenance. It Is Possible That, As A Result Of The Step-By-Step Implementation, The Project Is Simultaneously In Several Of The 3 Stages Mentioned. I. Joint Work Preparation The Clients Want To Use The Period Between Award And The Actual Start Of Implementation To Go Through A Period Of Work Preparation Together With The Contractor. The Aim Of This Period Should Be For The Parties To Arrive At The Maximum Possible Work Preparation Through A Number Of Consultations
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78867972
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.