Tenders Are Invited For Architectural, Engineering And Planning Services - New Building For The Flensburg Pr ...
Tender Notice
TenderID
78839621
Tender Brief
Tenders Are Invited For Architectural, Engineering And Planning Services - New Building For The Flensburg Professional Fire Department At Two Locations In Flensburg - Technical Equipment In Accordance With §§ 53 Hoai, Alg 1-8
Architectural, Engineering And Planning Services - New Building For The Flensburg Professional Fire Department At Two Locations In Flensburg - Technical Equipment In Accordance With §§ 53 Hoai, Alg 1-8. The City Of Flensburg Is Planning To Build The Flensburg Professional Fire Department At Two New Locations In The City. The Old Building Dates From The 1950S And Is No Longer Up To The Requirements Of A Modern Fire Station. A New Fire Department Building Is To Be Built In The East Of The City At The Adelbyer Kirchenweg Neubau Wache Ost Adelbyer Kirchenweg Location And In The West Of The City At The Quakenweg Neubau Wache West Quakenweg Location. The Planning Of The Buildings Is Carried Out Together Up To And Including Lph 2. The Further Planning And Implementation Of The Locations Will Be Carried Out One After The Other In The Order 1. New Construction Of The East Guard Station On Adelbyer Kirchenweg 2. The New Construction Of The West Guard Station On Quakenweg. The Old Location Will Remain In Use Until Wache West Is Put Into Operation. Wache Ost Approximately 83 Employees In The Fire And Rescue Service, As Well As Administration. Approx. 17 Vehicles Approx. 7000 M2 Gfa Property Size Approx. 11,500M2 Completion: Expected 4Th Quarter Of 2027 Kg 400: Approx. 6,394,000 Euros (Net) West Station Approx. 147 Employees In The Fire And Rescue Service, As Well As Administration. Approx. 28 Vehicles Approx. 8600 M2 Gfa Property Size Approx. 15,000M2 Completion: Expected In 2029 Kg 400: Approx. 10,203,000 Euros (Net) The West Station Will Function As The Main Station And Contain A Large Part Of The Fire Department Administration. At Both Station Buildings, Fire Brigade-Specific Workshops, Training Facilities And The Necessary Technical Infrastructure (E.G. Disinfection Shed/Gas Station) Will Be Implemented In The Building/On The Premises. Each Guard Station Includes The Construction Of A Fortified Training Yard, Which Must Be Designed For The Use Of Heavy Vehicles, As Well As The Construction Of A Parking Area, Which In Major Damage Situations Can Also Accommodate Parking/Parking For A Number Of Vehicles That Is Increased By A Factor Of 2.5 Compared To The Normal Requirement Is. The City Already Announced A Structural Design Competition In 2019. The Design By Atelier.Schmelzer.Weber Emerged As The Winner Of This Competition. Due To The Decision To Establish The Professional Fire Department At Two Locations In The City, The Architect Bernd R. Dörsing Was Commissioned To Prepare A Feasibility Study. The Feasibility Study Will Be Made At Least Partially Available To The Selected Offices With The Request For Offers. The Services To Be Awarded Consist Of: - Service Phase 2 Of The Technical Equipment In Accordance With §§ 53 Hoai; - Creation Of The Technical Part Of A Room Book For All System Groups; - Calculation Of Operating Costs For Photovoltaic Systems For The Power System Group; - Economic Efficiency Calculation For Photovoltaic Systems For The High-Voltage Systems Group; - Service Phase 3, Parts Of Service Phase 4 As Well As Service Phases 5 To 9 Of The Technical Equipment In Accordance With §§ 53 Hoai As An Optional Commission By Determination Of The Client (If Necessary In Stages To Be Determined By The Client); - Progress
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78839621
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.