Architectural, Construction, Engineering And Inspection Services – Pte - Pharmaceutical Innovation Ecosystem. Pte - Pharmaceutical Innovation Ecosystem Planning - The Subject Of The Public Procurement Is The Provision Of The General Planning Tasks (Preparation Of Licensed And Implementation Plan Documentation) Of The Pharmaceutical Innovation Ecosystem At The University Of Pécs. Duties Of The Winning Bidder (Processes Of Planning): - Preparation Of Basic Tests And Surveys; - Review Of The Planning Program; - Preparation Of Licensing Plan Documentation; - Preparation Of Visual Plans; - Preparing A Construction Plan; - Participation In Public Procurement; - Design Management. The Planning Work Parts To Be Ordered: Technical Description, Design Statement, Unpriced Budget Statement, Site Plan, Floor Plans, Sections, Facades, Room List, Window Closing Consignment, Demolition Plan (Sigr), Survey Plan, Plan Of Level Bridges, Node Detail Plans, False Ceiling Plan, Location Book, Other Consignments, Covering Plans, Other Detailed Plans, Protection Against Moisture, Glass Structure Work Part, Facade Technical Plans, Facade Cleaning, Scenery Plans, Item-Priced Budget, General Design Work Parts, Fire Protection Design Documentation, Building Automation And Building Supervision Design Plans, Medical Technology Plans. The Design Task Extends Especially To The Following Design Areas And Experts: Architectural Designer, Interior Designer, Civil Engineer, Building Engineer, Mechanical Engineering / External Utilities, Building Electrical Designer, Low Current Designer, Medical Technologist / Laboratory Technologist, Construction Fire Protection Design, Rehabilitation Engineer, Landscape Architect Engineer, Traffic Engineer. The Winning Bidder Is Also Responsible For Preparing A Priced Design Cost Estimate, As Well As Answering Technical And Professional Questions Regarding The Plans In The Public Procurement Procedure For Construction Investment To Be Conducted On The Basis Of The Design Documentation By The Required Deadline, As Well As Making The Necessary Modifications To The Plans In The Event Of A Legitimate Request Or Comment From The Bidder (Rectification Of Discovered Errors, Necessary Additions Making, Etc.) In The Public Procurement Procedure. Design Management: Part Of The Design Task Is That The Winning Bidder Undertakes The Étv. For The Performance Of Design Foreman Activities According To § 33, Paragraph (4). As Part Of This, He Participates In The Execution Cooperations With The Regularity Stipulated In The Contract And Prepares The Work Parts Necessary For Any Decisions That May Arise By The Deadline Necessary For The Continuous Progress Of The Execution. The Amount Of Design Supervision Is 145 Engineering Days (In 1 Engineering Day, The Parties Mean 8 Working Hours), For Which The Customer Reserves The Possibility Of A Quantity Deviation Of + 15 Engineering Days, I.E. The Customer Is Entitled To Use A Maximum Of 15 Engineering Days Of Design Supervision In Addition To The 145 Engineering Days, Which Is Included In The Design Supervision Fee Are Occupied. Subject Of The Planning: The Main Parameters/Quantities Of The Construction Project To Be Planned, As Well As The Quantitative Data Of The Planning Service: - Land Affected By The Planning:
|