Disciplinator For Main And Secondary Stage, Access To The Dressing Room: Tube Or Metalon Structure, Measuring 1.20 M In Height And 2.10 M In Width With Assembly And Disassembly. Being 300 Meters As Previously Described In The Project. E Ground Q30 – P30 Aluminum Structure, Including Accessories (Sleeve’S, Shoes, Hubs, Screws, “Cargo Stick”, Etc). Being At Least 2000 Meters (The Quantity Described Will Be Used Throughout The Structure Of The Event, Including In The Items Mentioned Above Where The Same Is Mentioned) As Previously Described In The Project, Meeting The Needs Of The Administration And Following The Riders Of The Artists Hired For The Event ., Team Of Staff And Loaders (This Team Being Supervised By The Promoter) For Loading And Unloading Services Of Event Equipment Such As: Stage, Sound, Lights, Groud, Gradiu Closing, Solid Brass Closing And Other Materials Linked To The Events Of The Administration. And Being Available For Any Eventuality That May Occur During The Execution Of The Entire Event, The Team Must Consist Of At Least 12 People. That It Remains Available For Any Eventuality And To The Riders Requested By The Artists., Supply Of The Entire Structure, Components And Electrical Installations Of The Stages, Tents, Dressing Room, Show Kitchen Tunnel, Two-Water Tent, Among Others (Which Are Detailed In The Items Of This Process) . Estimated Square Meters Of Wiring Is Around 3,000Mts². The Entire Structure Of The Electrical Part Must Be Carried Out In Accordance With What Is Stated In The Project And Monitored And Executed By Qualified And Certified Personnel. Lighting: Pp Cable With 2 Conductors 2.5 Mm Flexible; General Use: Pp Cable With 3 Conductors 4.0 Mm. Taking Responsibility For The Lamps, Reflectors, Wiring That Come From The Distribution Generators To The Inside Of The Tents With Circuit Breakers And 20Th Sockets, Emergency Lamps And All The Security Provided For In The Project. All Adaptations Being The Responsibility Of The Contracted Company, Following The Project And The Needs Of The Administration., Silenced Generator Group, Manual Or Automatic Start, Which Provides A Minimum Power Of 260.00 Kva, Voltage Of 220.00 Volts, Cycling At 60 , 00 Hz At 1,800.00 Rpm, With Diesel Engine, Turbocharged, Electrical And Ac Cables With Compatible On/Reverse Switch, Hour Meter, Grounding In Accordance With Technical Standards, Including Transport, Assembly, Necessary Installations, Supply, Necessary Operators And Disassembly. There Are 2 Generator Units. Silenced Generator Set, Which Provides Minimum Power Of 400, Necessary Operators And Disassembly. There Are 2 Generator Units. It Is At The Discretion Of The Administration And Project Of The Event Where They Should Be Installed, And Likewise The Period Of Operation Of Them To Supply The Entire Event., Emergency Lighting, Signage Signs, Protective Equipment (Extinguishers), The Company The Tendered Party Must Provide The Entire Security Aspect Of The Event Following The Project Specifications Prepared By The Responsible Engineer And Following The Same Guidelines If There Is A Change In The Project. Quantitative Signage Extinguisher Powder Bc: 30 Units, Emergency Lights: 30 Units, Fire Extinguisher Signage Plate: 30 Units, Exit Plate Units: 8 Units, Escape Route Signs (Right): 25 Units, Escape Route Signs (Left)
|