Flood Prevention Works – Ve371 Stahlwasserbau Sw Sulzbach Ii And Siel Sulzbach. Construction Site Equipment • Temporary Wooden Plank Covering (Approx. 51 M2) Rakes • Rakes (Approx. 0.6 Tons, Sheets And Hollow Profiles, Stainless Steel Including Accessories Such As Epdm Stop Plates, Chains, Locks Etc., Clear Opening Dn1800) Pipe And Line Construction • Steel Pipe Pressure Lines Dn 1800 (2 Strands With A Total Of Approx. 51 M, Structural Steel, Including Coating) Railings, Handrails, Footbridges, Platforms, Covers, Ladders, Fall Protection, Stairs And Equipment • Railings And Handrails (Hollow Profiles And Sheets, Structural Steel, Hot-Dip Galvanized, Approx . 1.7 Tons) • Filler Bar Railings (Hollow Profiles And Sheets, Structural Steel, Hot-Dip Galvanized, Coated, Approx. 0.42 Tons) • Stirrups, Barrier Posts (Hollow Profiles And Sheets, Structural Steel, Hot-Dip Galvanized, Approx. 0.21 Tons) • Walkways, Platforms , Covers, Mobile Staircase Substructure (Bars, Shaped Steel, Sheets, Structural Steel, Hot-Dip Galvanized, Approx. 9.0 Tons) • Walkways, Platforms, Covers, Mobile Staircase Gratings 30X3 Mm (Structural Steel, Hot-Dip Galvanized, Approx. 44.0 M2) • Covers Tear Plates Tr 8 Mm (Mild Steel, Hot-Dip Galvanized, Approx. 51 M2) • Fixed Ladders (Stainless Steel, Approx. 72 M Ladder Length, Including Entry Aids, Fall Protection Rails, Protective Equipment, Etc.) • Horizontal Rail Safety Systems (Stainless Steel, Approx. 11 M) • Various Pieces Of Equipment (Signs, Security Chains, Locks, Wall Brackets, Etc.) • Casting And Lining Work, End Supports And Floor Rails For Inspection Locks • Base Sleepers (Stainless Steel, Approx. 20.5 M) • Guide Rails (Stainless Steel, Approx. 39 M) • Casting Work Crane System • Bridge Crane (Load Capacity 6.3 Tons, Track Center Dimension 9.05 M) • Crane Tracks (2 Strands, Continuously Supported, Crane Rails A45 Approx. 36.3 M, Continuous Elastic Bases Approx. 34.4 M, Continuous Base Plates Approx. 36 .4 M, Crane Rail Clamps With Anchors Approx. 148 Pieces, Including Crane Track Buffers And Track End Securing) • Casting Work • Temporary Protective Covers, Test Load, Signage, Sling Chain General • Commissioning, Crane Testing/Commissioning • Trial Construction, Inspection Locks • Instructions Technical Processing • Planning Services, Documentation/Inventory Planning, Ce -Markings, Ce Declaration Of Conformity • Instruction Protocols Siel Sulzbach Construction Site Equipment • Temporary Wooden Plank Covering (Approx. 14 M2) • Scaffolding Work (Stair Tower 1 Piece Up To Approx. 2.20 M Construction Height, Side Protection Approx. 20 M) Shut-Off Devices • 4 Pieces Of Gate Valves (Approx. 2.10 M Wide X 2.10 M High) For Subsequent Grouting • Grouting Work On Frame And Floor Profiles • Covers, Drive Stands, Protective Hoods, Linings • Actuators • Maintenance Work Before Commissioning • Seal Change Before Commissioning (Required Position) Railings, Walkways, Platforms, Covers, Fixed Ladders, Stairs And Equipment • Rail And Filler Bar Railings (Hollow Profiles And Sheets, Structural Steel, Hot-Dip Galvanized, Approx. 1.3 Tons) • Stirrups (Hollow Profiles And Sheets, Structural Steel, Hot-Dip Galvanized, Approx. 0.06 Tons) • Footbridges, Platforms, Covers
|