Place Of Order Fulfillment: Ul. Janowiecka 98A62-100 Wągrowiec Plot No. 2842/7 Registration District: City Wągrowiec District: Wągrowiec Voivodeship: Wielkopolskie Scope Of Works Was Arranged As Follows: Task No. 1 Entitled: Thermal Modernization And Reconstruction Of The Premises Of Gzgkim In Wągrowiec Includes: Task No. 1 A. Reconstruction Of The Premises Of The Gzgkim Building In Wągrowiec. Range The Works Include Reconstruction And Comprehensive Renovation Of The Rooms On The Basement Floor - Ground Floor And Adapting Them To The Needs Of The Ordering Party, In Particular Separating Sanitary And Social Rooms For The Needs Of Technical And Economic Service Workers, As Well As Carrying Out Construction And Renovation Works In The Boiler Room (Replacement Of The Central Heating Furnace Is Not Planned, And Only Works Related To Switching On A New Central Heating Installation). Additionally, The Scope Of Work Includes The Renovation Of The Toilet On The First Floor. This Task Does Not Include The Reconstruction Of The Toilet In The Basement As This Scope Of Work Is Covered By A Separate Cost Estimate (Task 2.B). Area Of The Rooms To Be Rebuilt - Ground Floor - 150.2 M2; Toilet On The First Floor - 11.6 M2 Task No. 1B - Thermal Modernization Of The Gzgkim Building In Wągrowiec - Task Left To The Option - The Ordering Party Reserves The Right To Resign From This Task As Part Of The Option - I.E. In Accordance With Art. 441 Of The Public Procurement Law. The Scope Of Work Includes In Particular: 1) Insulation Of The External Walls Of The Building With Polystyrene Foam. 20 Cm In The Scope Of: The Eastern Façade, A Low Building, The Western Façade, The Southern Façade, A High Building; 2) Insulating The Wall - The Northern Facade With 5 Cm Polystyrene (Adding To The Existing Insulation) 3) Insulating The Plinth Walls Below And Above The Ground, 4) Covering The Roof With Thermally Weldable Felt, 5) Unblocking The Rainwater Drainage System, Including - Installation Of Gutter Settling Tanks; 6) Construction Of A New Sewage Connection To The Building, 6) Performance Of Related Works, In Particular Demolition Works, Sheet Metal Work, Gutters And Downspouts. This Task Does Not Include Insulation Of The Eastern Facade - A High Building And The Southern Facade - A Low Building - These Works Were Included In The Bills Of Quantities Related To The Construction Of An Elevator (Task 2 A). Task No. 2 - Expansion Of An Office Building With An Elevator And A Vestibule In Wągrowiec At Janowiecka Street 98A And Improving Communication And Information Accessibility, In Order To Eliminate Barriers And Increase The Accessibility Of The Building Of The Headquarters Of Gzgkim In Wągrowiec And Gops In Wągrowiec - Task Co-Financed By Pfron Task No. 2A: Extension Of The Office Building With An Elevator With A Vestibulethe Scope Of Work Includes The Addition Of An Elevator To The Top Of The Building Existing, And The Related Scope Of Work Enabling The Use Of The Facility By People With Special Needs. The Extension Includes In Particular: 1) Construction Of An Elevator Vestibule With An Area Of 4.52M2; 2) Construction Of The Elevator Shaft - Brick Shaft With Internal Dimensions. 1.63M X 1.93M; 3) Installation Of An Electric Crane - With A Lifting Capacity Of 630 Kg; For 8 People, 4 Stops; 4) Insulating The Walls And Ceiling Of The Elevator Shaft, Its Vestibule And The Walls To Which The Elevator Will Be Attached, 5) Hardening - One Parking Space For The Nps With Access To The Elevator And Its Immediate Vicinity, 6) Performing The Necessary Demolition And Adaptation Works And Removing Collisions 7) Execution Of Electrical Works, I.E. Electrical Installation Of The Elevator Vestibule, Electrical Installation Of The Elevator, And Lightning Protection Installation. Task No. 2B - Adaptation Of The Hygiene And Sanitary Room To The Needs Of People With Special Needs - Bathroom For The Disabled. The Scope Of Work Includes The Adaptation Of One Of The Rooms On The Ground Floor Into A Toilet That Meets The Requirements Of People With Special Needs, In Particular Providing Space To Maneuver A Wheelchair. Areas After Reconstruction - Room No. 08 - 5.2 M2. The Scope Of Work Includes In Particular: 1) Demolition And Disassembly Works Regarding Installations, 2) Construction Of New Surfaces And Floors As Well As New Wall Cladding And Ceiling, 3) Replacement Of The Entrance Door With Wider Ones, 4) Construction Of New Water, Sewage And Electrical Installations, 5) Installation Of Handles And Necessary Barrier-Free Equipment, Task No. 2 C. Communication And Information Accessibility. The Scope Of Work Includes: 1) Purchase Of Typhlographic Plans, One For Each Floor - 3 Pieces; 2) Purchase And Installation Of An Information And Navigation System - In Five Indicated Locations In The Building; 3) Purchase And Installation Of An Alarm System - Sound And Visual (1 Set = 3 Pcs). Additionally: The Scope Of Tasks Includes Performing The Necessary Accompanying, Temporary And Security Works, As Well As Works Resulting From The Technology Of The Materials Used. These Works Should Be Included In Individual Cost Estimates. The Detailed Scope Of Work For The Above-Mentioned Tasks Is Included In Individual Cost Estimates - Bills Of Quantities, Prepared On The Basis Of Design Documentation, Which In These Proceedings Should Be Understood As: 1) Design - Reconstruction And Thermal Modernization Of An Office Building - Municipal Utility And Housing Department In Wągrowiec Ul. Janowiecka 98 A 62-100 Wągrowiec - Archi Art Design Unit. Łukasz Małysz Ul. Leśna 1A/16, 62-023 Robakowo2) Project - Extension Of The Building Of The Municipal Utilities And Housing Plant In Wągrowiec Ul. Janowiecka 98 A 62-100 Wągrowiec, Archive Art Design Unit. Łukasz Małysz Ul. Leśna 1A/16, 62-023 Robakowo3) Technical Specifications For The Execution And Acceptance Of Works. Prepared By: Archi Art Design Unit. Łukasz Małysz Ul. Leśna 1A/16, 62-023 Robakowo Due To The Planned Co-Financing From Pfron And The Reservation Of The Possibility Of Exercising The Option Right Specified In Art. 444 Of The Public Procurement Law, The Ordering Party Has Separated Tasks And Sub-Tasks In The Order, For Which The Scope Of Work To Be Performed (Bills Of Quantities) Has Been Described In Detail. Therefore, In Order To Identify The Works To Be Performed, The Above-Mentioned Documentation Describing The Subject Of The Contract Should Be Read Together.
|