Works For Complete Or Part Construction And Civil Engineering Work – Jg 1 - 41, 3.Ba Los 401B. The J. - Gagarin-Ring 1 - 4 Building With 40 Existing Apartments Has Been Vacated And Has Already Been Completely Gutted. After The Renovation Work, There Will Be 30 Barrier-Free Apartments In Accordance With Din 18040-2 In The Building. Sanitary Installation: All Basement Distribution Pipes And Riser And Fall Pipes Including Fittings And Insulation For Hot And Cold Drinking Water, For Drinking Water Circulation And For Dirty Water Disposal As Well As Rain Drainage Will Be Replaced. The Installation Guide In The Bathrooms Takes Place In Newly Created Installation Walls. All Sanitary Objects And Fittings Will Be Renewed. Rimless Wall-Mounted Toilets Including Integrated Water-Saving Cisterns, Hand Basins, Built-In Bathtubs Including Heat-Insulating Polystyrene Supports And Shower Enclosures And/Or Shower Trays Including Heat-Insulating Polystyrene Tray Supports And Shower Enclosures Are Installed. Floor-Level Showers With Shower Enclosures Will Be Installed In The Barrier-Free Bathrooms. In The Future There Will Be A Permanently Installed Washing Machine Connection In All Bathrooms. Heating: All Apartments Will Be Heated With Underfloor Heating In The Future. Towel Dryers Will Also Be Installed In The Bathrooms, Which Will Also Be Powered By District Heating. Ventilation: All 30 Apartments Receive Motorized Chimney Ventilation With Negative Pressure Control. Components Or Service Content Include Exhaust Air Automats In The Kitchen And Bathroom, Ventilation Chimney (Spiral Folded Pipe With Fire Damper) And Roof Fans.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78631076
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.