Electrical Installation Work Of Electrical Distribution Apparatus - New Wing M At The Jrc Karlsruhe Location Delivery Of The Technical Building Equipment Tga Part 2 - Electrical Engineering, Control And Communication Technology, Radiation Protection Measurement Technology. At The Jrc Karlsruhe Location, The Construction Of An Additional, Separate Laboratory And Storage Building, Wing M, Was Planned And Construction Work Began. The New Building Measure Has A Gross Floor Area Of Approx. 8,500 M2 And Serves To Ensure The Necessary Infrastructure For Scientific Work In The Future. After The Work Was Interrupted, It Is Now Necessary To Continue The Project For The Remaining Measures For The Complete Construction And Commissioning Of Wing M. The Main Packages Are Technical Building Equipment (Tga 1 And 2) And System Security (As). A Suitable Contractor (An) Is Being Sought For The Tga 2 Trade. The Scope Of The Tga 2 Package Advertised Here Includes The Following Systems And Components: Electrical Engineering Trade: — Medium-Voltage Switchgear Including Transformer Station Equipment, — Emergency Power Systems, — Ups Systems, — Main And Sub-Distribution Systems, — Electrical Installations, — Lighting Systems, — Cable Management Systems, — Grounding And Lightning Protection, Control And Communication Technology: — Telephone Private Branch Exchange And Data Networks, — Announcement System, — Intercom System, — Clock System, — Fire Alarm System, — Gas Warning System, — Seismic Instrumentation, — Expansion Of The Existing Hazard And Video Management System (Gvms), — Operating And Observation System (Bub), — Negative Pressure Reporting System, Radiation Protection Measurement Technology: — Monitoring Of Air Activity, — Personal Monitoring, — Local Dose Rate Monitoring, — Criticality Warning System, — Mobile Measuring Devices, — Low Level Measuring Station, — Central Measuring Station, — Test Emitters.
|