Screed Works – New Construction Of A Daycare Center In Veitsbronn - Estrich. The Veitsbronn Administrative Community, Represented By Bayerngrund Property Beschaffungs- Und Erdungs-Gmbh, Intends To Build A Day-Care Center With A Crèche, Kindergarten And Daycare Center. This List Of Services Covers: Screed Work, Deadlines: Start Of Construction: Within 12 Working Days After Receipt Of The Request From The Client (§ 5 Paragraph 2 Sentence 2 Vob/B). You Will Probably Receive The Request By June 21, 2024; Your Right To Information In Accordance With Section 5 Paragraph 2 Sentence 1 Vob/B Remains Unaffected By This. The Service Must Be Completed (Ready For Acceptance) Within 55 Working Days Of The Deadline Marked Above For The Start Of Execution. During The Execution Of The Main Services Of The Screed Work Trade, The Following Trades Are Expected To Be Active On The Construction Site: - Hls - Elt - Drywall - Interior Plastering Information On The Execution Measurement Before The Work Is Carried Out, The Installation Situations Must Be Measured On Site And The Planning Must Be Coordinated With The Conditions On Site. Actual Installation Heights In Relation To The Entire Expansion System Must Be Agreed With The Construction Management If Impermissible Tolerances Or Changes To The Planned Floor Structure Are Identified Or Suspected. If Additional Thicknesses Are Required Compared To The Specifications Or If It Emerges From The Meter Plan That Planned Screed Thicknesses Cannot Be Adhered To, A Decision Must Be Made In This Regard With The Construction Management Before Execution. Compensation Tolerances Are Only Compensated If They Exceed The Values Specified In Din 18 202 Or, In The Case Of Flowing Screed, 20% Of The Nominal Thickness. Execution Work - Danger Areas During Execution Work Must Be Cordoned Off And Marked. If This Creates Obstacles For Other Contractors Or Third Parties, The Period Of Closure And Alternative Measures Must Be Agreed With The Construction Management And The Sigeko. Storing Compressed Gas Cylinders In Basements, Stairwells, Passageways And Driveways Is Prohibited. A Portable Fire Extinguisher, Class C According To Din En 2 - Or Comparable For Use - Must Be Available When Working With Flammable Gases. - An Exposed Concrete Wall Is Provided Everywhere In The Stairwells And Hallways, And Also In Some Of The Changing Rooms, Etc. This Should Be Protected During Sanding And Sealing And Under No Circumstances Should It Be Damaged. - Self-Adhesive Edge Strips Placed On The Bare Ceiling Must Be Applied So That They Overlap So That All Components Are Effectively Separated And An Excess Length Over The Ok Screed Is Guaranteed. The Edge Strip Overhang Must Generally Not Be Cut Off By The Screed Layer. It Is Cut Off Flush With The Covering By The Floor Layer, Concrete Stone Layer, Etc. To Ensure That The Contact Separation In The Edge Connection Is Maintained. - Before Laying The Top Coverings, Any Joints That May Have Formed Must Be Professionally Pegged With Synthetic Resin And Filled. Prev
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78580874
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.