Police Station Construction Work – Trnava, Kr Pz, Kollárova 31, Building Reconstruction. The Subject Of The Contract Is The Modernization And Reconstruction Of The Building Aimed At Improving The Thermal Protection Of The Building. Regional Directorate Of The Police Force At Kollárova Street 31 In Trnava Within The Scope Of The Processed Construction Project. As Part Of The Reconstruction Of The Building, The Repair Of External Plastering, Insulation Of Facades And Plinth, Complete Renovation Of The Flat Roof - Insulation, Replacement Of Windows, Glazed Walls, Parapets, Replacement Of Plumbing Products - Gutters, Downspouts, Sheeting, Replacement Of Locksmith Products - Window Grilles, Railings, Repair Gutters And Adjacent Parts Of Paved Areas, Reconstruction Of Selected Sanitary Facilities, Reconstruction Of The Heating System By Installing An Air-Water Heat Pump, Reconstruction Of The Heat Exchanger Station, Assessment And Proposal For The Replacement Of Heating Elements, Replacement Of Part Of The Central Heating System Resp. Implementation Of Reduction Of Heat Losses Of Heat Distribution (Replacement Or Improvement Of Thermal Insulation), Hydraulic Regulation Of The Heating System, Installation Of Zone Regulation, Installation Or Replacement Of Thermoregulation Valves, Implementation Of Measurement And Regulation Of Heat Consumption, Including Installation Of Intelligent Measurement Systems For Collection, Processing And Transmission Of Measured Data On Energy Consumption, Reducing The Temperature Drop Of The Heating System, Introducing Night And Weekend Temperature Reduction In Heated Spaces, Assessing The Possibility Of Implementing Heat Recovery Systems, Recuperation, Installation Of Flat Solar Panels, Replacing Water Faucets With Lever Faucets, Including The Installation Of Aerators, Replacing Water Faucets With Thermostatic And Automatic, Implementation Of Thermal Insulation Of Rising And Horizontal Dhw Distribution Systems, Replacement Of Forced Ventilation Systems With Waste Heat Recovery, Installation And Replacement Of Forced And Hybrid Ventilation Systems That Have A Demonstrable Effect On Reducing The Energy Demand Of The Building, Electrical Installation Reconstruction (Lighting Installation, Socket Installation, Design And Placement Of Switchboards) , Including The Necessary Measurement And Control, And The Modernization Of The Relevant Power Distribution Systems, The Modernization Of The Lighting System With An Advanced Automatic Control System, The Reconstruction Of The Lighting Of The Yard And The Entrance To The Building From The Facade Of The Building, The Installation Of Photothermal Systems And Battery Systems, The Replacement Of Elevators And The Creation Of A Ramp For Immobile Visitors. The Building Has One Construction Object: So 01 – Trnava Kr Pz The Realization Of Construction Works Will Take Place While The Object Is In Operation.
|