The Bridge Railing Has A Total Length Of 390 Meters. The Entire Surface Of The Old Coating Should Be Cleaned Of Dirt, Dust, Grease, Oils, Poorly Adhering Coatings And Corrosion Products Such As Rust And White Rust Using A High-Pressure Water Cleaner (Up To 400 Bar) (See Appendix 4). After A Sufficient Drying Time, The Bridge Railing Is Then Coated Several Times With An Application System According To Ztv-Ing. In Places, Damaged Areas Must Be Sanded Mechanically Or Manually To The Surface Preparation Level Pma Or Pst3 In Accordance With Din 12944-4. It Is Essential To Set Up A Mobile Protection System For Cleaning And Coating Work (See Appendix 3). The Sidewalks Can Carry A Maximum Load Of 500 Kg/M². Before Determining The Offer Prices, Precise Knowledge Of All Local Conditions And Contexts Is Required. The Bidder Is Therefore Recommended To Inform Himself By Inspecting The Construction Site, Checking The Access Routes And All Options For Setting Up The Construction Site, The Supply Of Electricity, Water And Everything Else.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78524941
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.