1. The Subject Of The Order Is The Construction Of An Additional Slide With A Dynamometer And Reconstruction Of The Platform Of The Existing Slide And Development Of The Area Within The Recreation And Sports Center In Krosno At Ul. Bursaki Together With Preparatory And Accompanying Works, In Accordance With The Building Permit Decision Issued By The Mayor Of Krosno No. 307/2019 Of November 18, 2019, Reference Number: Pb.6740.1.125.2019.L. A Detailed Description Of The Subject Of The Order Is Specified In The Attached Document. Swz Construction Design, Detailed Design, Technical Specification For The Execution And Acceptance Of Works, Additional Guidelines For The Implementation Of The Subject Of The Order And Bill Of Quantities. The Description Of The Subject Of The Order In The Construction Design Attached To The Swz Is Included In The Following Parts: Volume I.1 - Land Development. In The Scope Relating To The Addition To The Existing Slide Of A New Slide.Volume I.2 - Technical Expertise With An Inventory.In The Scope Relating To The Addition Of A New Slide To The Existing Slide.Volume I.2 A - Geotechnical Documentation Of Subsoil Tests And Geotechnical Opinion.In The Scope Relating To The Addition Of A New Slide To The Existing Slide Slide. Volume I.2C - Geotechnical Design. In The Scope Of The Addition Of A New Slide To The Existing Slide. Volume Ii Architecture: Pb Krosno Description Architecture: 2.4. Additional Slide In An Existing Slide3.3. New Slide For The Existing Slide (D.Iii)4. Description Of Structural And Technological Elements5. Water And Sewage Networks6. Internal Water Supply Installations7. Pool Water Installation8. Electrical Installations9. Low Current Electrical Installations10.5. New Slide For The Existing Slide (D.Iii)10.7. Construction Of Sidewalks From Paving Stones10.8. Construction Of The Fence10/10. Leveling The Area, Spreading Topsoil, Sowing With Grass Mixture10.11. Execution Of Linear Drainage10.12. Execution Of External Installations, Including: Rainwater Drainage, Electricity, Water Supply, Technological Sewage. Drawing Part: A_03 New Slide To The Existing Slide D.Iiia_04 New Slide To The Existing Slide D.Iii Details Volume Iii - Construction.Pb_04 - Site Plan - Existing Condition - Slidepb_ 05- Plan Turbo Slidepb_06 - Dimensioning Board - Slidespb_K_07 Foundations Turbo Slidepb_K_08 Construction Steel Extension Of The Slide, Part 1 (Note: Replacement Of The Existing Steps And Platforms Should Be Made Of A Solid Brown Composite Board With A Substructure Guaranteeing Appropriate Load-Bearing Capacity And Stiffness Of The Given Element)Pb_K_09 Steel Structure Extension Of The Slide Part 2Pb_K_10 Construction Steel Extension Of The Slide, Part 3, Volume Iii, Description, Volume Iv - External Water And Sewage Networks. In The Scope Regarding The Addition Of A New Slide To The Existing Slide. Volume V - Swimming Pool Water Technology. In The Scope Regarding The Addition Of A New Slide To The Existing Slide. Volume Vi - External Electrical Installations. In The Scope Related To The Addition Of A New Slide To The Existing Slide. Volume Vii - Technical Specifications. In The Scope Related To The Addition Of A New Slide To The Existing Slide. The Details Of The Above-Mentioned Parts Of The Construction Design Can Be Found In The Identical Studies Of The Detailed Design Attached To The Swz. Attention! When Executing The Order, The Contractor May Use Materials Or Devices From Any Manufacturer, Provided That These Materials And Devices Have Parameters Not Worse Than Those Described In The Tender Documentation. The Ordering Party Indicates That In Accordance With The Provisions Of Art. 100 Paragraph 1) Of The Public Procurement Law, Requirements Regarding Accessibility For Disabled People And Taking Into Account The Needs Of Users Are Included In The Description Of The Subject Of The Order (Design Documentation). In Order To Properly Execute The Order, Other Costs Listed Later In This Document Should Also Be Taken Into Account. Online Map Portal Enabling With The Land Development And Existing Technical Infrastructure Can Be Found At: Https://Krosno.Webewid.Pl/E-Uslugi/Portal-Mapowy Obliview. The Ordering Party Informs That In Accordance With Art. 101 Section 4 Of The Public Procurement Law, If In The Description Of The Subject Of The Contract There Is A Reference To Standards, Technical Assessments, Technical Specifications, Each Of These Indications Is Accompanied By The Words Or Equivalent. Note: In Connection With The Specified Deadline For The Execution Of The Subject Contract, The Ordering Party Requires The Contractors To When Preparing The Offer, They Took Into Account The Need To Ensure Such Organization Of Works And Protection Of Existing Equipment And Elements Of The Facility To Ensure Proper Use Of The Facility And The Area Of Works Performed In An Active Recreational And Sports Facility In Terms Of Safety.2. The Ordering Party, In Accordance With Art. 95 Of The Public Procurement Law And Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code, Requires The Contractor Or Subcontractor To Employ, Under An Employment Contract, Persons Performing The Following Activities Within The Scope Of The Contract: Electrical Installation, Sanitary, Earthwork, Concrete And Reinforcement Works.
|