1. The Subject Of The Order Is The Implementation Of The Task Entitled: Comprehensive Renovation And Conservation Works On The Historic World War I Cemetery No. 41 In Bieździadka, Co-Financed By The Government Program For The Reconstruction Of Monuments. 2. Scope Of Work: Foundations: 1. Preparatory Work Consisting In Preparing The Area Around The Facility For Strengthening The Foundations. The Southern Wall On The Side Of The Ditch Is In The Worst Condition, Where Due To Soil Loss, The Foundations Have Been Severely Exposed And Are Hanging In The Air In Places. Therefore, In Addition To Strengthening The Foundations, The Slope Should Be Secured In The Indicated Section.2. Preparation Of Reinforcement For Watering The Foundations.3. Segmental Excavation Of The Foundation Part, Reinforcement, Formwork And Pouring Concrete.4. Horizontal Insulation Using E.G. Bituminous Mats.5. Vertical Insulation Of Foundations. Strengthening And Securing The Slope: 1. Strengthening The Slope Along The Wall. Using Reinforcing Mats (Anti-Erosion Mats, Lawn Grids) And Planting With Appropriate Turf Or Ground Cover Plants That Take Root Well.2. Widening The Strip Of Land Between The Base Of The Wall And The Edge Of The Ditch (Lower Layer Of The Embankment With The Addition Of Improved Soil, E.G. With A Hydraulic Binder). Making An Embankment From Earth. Use Of Tamping Equipment. Planting The Embankment. Conservation Work On Stone Elements: 1. Cutting Down And Destroying Self-Seeding Bushes Growing Right Next To The Fence (From The West) On The Outside Using Herbicides. Repeat The Treatment Up To 3 Times. Use In Accordance With The Manufacturers Instructions And Observing Safety Precautions.2. Cleaning The Stone Wall Of The Fence And Pillars From Layers, Removing Mosses And Lichens By Scraping Them Off With Putty Knife, Chipping Out All Cement Joints From Recent Repair Works.3. Local Protection Of The Falling Stone Surface With A Strengthening Preparation.4. Cleaning The Wall Surface Using The Abrasive Blasting Method Using Sand Abrasive, Blowing It Off With Pressurized Air Or Rinsing The Cleaning Residue With Water.5. Cleaning The Main Monument From Dirt From The Stone By Washing It With Hot Water Under Pressure Or Superheated Steam.6. Securing Wall Cracks Using The Injection Method Or Introducing Carbon Fiber.7. Filling Small Cavities With Mineral Putty.8. Reconstruction Of Individual Parts Of Walls Using Technically And Aesthetically Matched Stone Slates While Maintaining The Appropriate Shape And Geometry.9. Small Defects Should Be Supplemented With Mineral Mass With Technical Color Parameters Precisely Matched To The Original Stone. Larger Defects Should Be Supplemented With A Stone With Similar Parameters To The Original.10. Stabilization Of The Pole At The Gate, Partial Disassembly (Stone Cover), Correct Vertical Positioning Of The Pole Without Its Dismantling, Reinforcement Of The Foundation.11. Disinfection Of The Wall With A Bactericidal, Fungal And Algaecide Preparation Applied By Brush Or Spray.12. Impregnation Of The Stone With A Hydrophobic Agent With A Siloxane Preparation By Spraying Or Brushing Wet On Wet. It Is A Solution Of Organosilicon Compounds In A Gasoline Solvent, With A High Ability To Penetrate Into Porous Stones. Conservation Works Of Concrete Elements: 1. Cleaning Concrete Surfaces From Surface Deposits That Are Loosely Attached To The Substrate.2. Cleaning The Surface From Dirt, Etc. Using Methods Established During Tests, E.G. By Sandblasting With Ce-Pe.3. Cleaning The Concrete Surface From Biological Dirt Mechanically Using Soft Nylon Brushes And Chemically.4. If Necessary, Impregnation Of Concrete By Spraying,5. Filling Gaps And Empty Spaces In The Concrete Structure, E.G. With Cement Suspension.6. Filling Cracks And Damage: Reconstruction Of Missing Elements (Casts) And Filling Of Gaps. Sealing The Cracks And Gaps Between Individual Parts Of Concrete With Mass (Plastic-Refined, Fine-Grained Putty For Renovation Of Concrete Building Elements). Filling The Form And Defects In Concrete With Mineral Mass Colored With Alkali-Resistant Pigments. The Method Of Finishing The Surface - The Texture Imitates The Surroundings.7. Impregnation Of Concrete Caps.8. Priming And Painting Concrete Coatings With Paints In The Established Technology And Colors. The Painting Technology And Colors Should Be Adapted To The Commissions Details.9. Cleaning The Surfaces Of Stairs And Concrete Covers On Stringers (Sandblasting).10. Cleaning The Stone Square In Front Of The Entrance Gate (High-Pressure Washer). Conservation Work On Metal Elements: 1. Dismantling The Cross, Gate And Metal Fence With Entrance For The Period Of Repair Work, And Carrying Out Repair Work In Workshop Conditions.2. Cleaning From Rust And Paint Layers. The Easiest Way To Perform The Treatment Is To Use The Abrasive Blasting Method. Then Mechanical Cleaning (Sandpaper, Wire Brushes) And Chemical Cleaning Using A Paste For Removing Oil Coatings Containing Solvents3. Regeneration Of Hinges And Gate Closure (Latch).4. Sanding The Metal Surface With Sandpaper With A Grit From 60 To 240.5. Painting The Metal Surface Twice With Mini Anti-Corrosion Paint.6. Double Painting Of Metal Elements With Two-Component Structural Polyurethane Varnish. Enamel With High Resistance To Weather Conditions, Effective Anti-Corrosion Protection Thanks To The Content Of Metallic And Anti-Corrosion Pigments And A Very Good Aesthetic Effect.7. Installation Of A Metal Cross On The Top Of The Obelisk. Preparation Of Conservation Documentation1) Preparation Of Current Conservation Documentation (The Study Is To Contain A Description Of The Current State Of Preservation Of The Chapels Elements And The Results Of The Necessary Preliminary Specialist Research).2) Preparation Of Conservation Documentation Of The Works Carried Out (The Study Is To Contain A Description Of All Individual Works Conservation Works That Were Carried Out, Additionally Documented With Photographic Documentation). The Price Indicated In The Offer Should Also Include The Fee For Occupying The Road Lane Of The District Road For The Duration Of Construction Works On The Bridge, Stairs And Wall.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78477211
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.