Painting Work – Blb K/Brühl/K-Soli Exterior Skin Renovation Aburg + Orangery/Painting Work Orangeries + Cuckoo. The Castle Building, The South Orangery With The Centrally Arranged Gate Building, Called The Cuckoo, And The North Orangery With The Attached, Former Farm Building, Require Repair And Comprehensive Renovation Of Their Outer Shells. In Order To Renovate The Facade Areas Of The Orangeries And The Cuckoo, Painting Work Is Required For The Planned Measures. These Should Be Carried Out Using A Mineral Silicate Paint System That Has Been Specifically Tested For The Conditions In The Orangeries. The Renovation Of The South Orangery, The North Orangery And The Cuckoo Is Planned In Two Sections Based On Components. First Of All, The Two Wings Of The South Orangery And The Cuckoo Will Be Worked On In The First Construction Phase (August 19Th - November 6Th, 2024). In The Second Construction Phase (September 22Nd - October 16Th, 2025), Work On The North Orangery Will Be Carried Out.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78473252
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.