The Subject Of The Order Is The Implementation Of Construction Works On The Above-Mentioned Task In The Scope Of: Expansion Of Ul. Rehabilitacyjna On A Length Of 550 M On The Section From Ul. Starkiewicza In Busko-Zdrój To Ul. Zdrojowa In Zbludowice, Including: Road Industry In The Scope Of: 1) Preparatory And Demolition Works; 2) Earthworks And Finishing Works; 3) Milling Of The Existing Road Surface; 4) Construction Of The Road Structure Of Rehabilitacyjna Street From A Layer Of Sand Stabilized With Cement Rm =2.5Mpa Gr. 20 Cm, Main Layer Of Crushed Aggregate Stabilized With Moss. Fractions 0/31.5Mm And 0/63Mm Thick. 25 Cm;5) Construction Of Bituminous Layers Of The Road, Including: A Binding Layer Of Ac16w Asphalt Concrete, 4 Cm Thick, And A Wearing Course Of Ac 11S Asphalt Concrete, 4 Cm Thick;6) Construction Of A 2.0 M Wide Sidewalk With A Structure Of A Layer Of Sand Stabilized With Rm Cement =1.5Mpa Gr. 10 Cm, Main Layer Of Crushed Aggregate Fraction 0/31.5 Mm Thick. 15 M And With A Surface Made Of Phaseless Concrete Cubes, Thickness. 8 Cm, Gray Color, Behaton Type;7) Construction Of A 2.0 M Wide Bicycle Path With A Structure Made Of A Layer Of Sand Stabilized With Cement Rm=1.5Mpa Thick. 10 Cm, Main Layer Of Crushed Aggregate Fraction 0/31.5 Mm Thick. 15-18 Cm;8) Construction Of Bituminous Layers Of The Bicycle Path, Including: A Binding Layer Of Ac16w Asphalt Concrete, 4 Cm Thick, And A Wearing Course Of Ac 8S Asphalt Concrete, 4 Cm Thick;9) Laying Concrete Curbs With Dimensions 15X30x100cm, Arrangement Of Edges With Dimensions 8X30x100cm, On A Concrete Bench With Resistance C12/15; And Laying A Concrete Palisade 12X18x100cm 10) Making Vertical And Horizontal Road Markings Made Of Thick-Layer Chemically Hardened Mass In Accordance With The Agreed Design Of The Target Traffic Organization. 11) Making The Structure Of The Elevated Intersection Of The Road Of Starkiewicza Street From A Layer Of Sand Stabilized With Cement Rm = 2.5Mpa Thick. 20 Cm, Main Layer Of Crushed Aggregate Stabilized With Moss. Fractions 0/31.5Mm And 0/63Mm Thick. 25Cm; Including A Surface Made Of Phaseless Concrete Cubes, Thickness 8 Cm, Red, Behaton Type; 12) Construction Of Road Traffic Safety Elements, Including Steel Sidewalk Barriers 1.10 M High, Installation Industry In The Scope Of: 1) Construction Of A Storm Sewage System Using Pvc-U S Sdr 34, Sn8 Pipes With A Diameter Of 400 Mm On Length 229.30 M; 2) Construction Of A Storm Sewage System Made Of Pvc-U S Sdr 34, Sn8 Pipes With A Diameter Of 300 Mm On A Length Of 450.70 M; 3) Construction Of Connections For The Storm Sewage System Made Of Pvc-U S Sdr 34, Sn8 Pipes With A Diameter Of 200 Mm With Ends Concrete Inlets With A Diameter Of 500 Mm; 4) Reconstruction Of The Medium And Low Pressure Gas Network In The Road Lane Of Rehabilitacyjna Street Due To The Collision With The Planned Road Infrastructure. 5) Reconstruction Of The Water Supply Network With A Diameter Of 110 Mm And The Sanitary Sewage Network With A Diameter Of 200 Mm In The Road Lane Of Rehabilitacyjna Street Due To Collision With The Designed Road Infrastructure.6) Construction Of A Section Of A Covered Ditch Made Of Reinforced Concrete Pipes With A Diameter Of 1000 Mm And A Length Of 87.0 M In The Area Of The Intersection Of Rehabilitacyjna And Starkiewicza Streets In Busko-Zdrój. Electrical And Telecommunications Industry In The Scope Of: 1. Reconstruction And Protection Of The Existing Orange Telecommunications Infrastructure, Colliding With The Designed Elements Of The Road Lane Of Ul. Rehabilitation;2. Construction Of A Separate Yakxs 5X35 Mm² Street Lighting Cable Line With Installation Of 9.0 M High Steel Road Poles And Led Road Lighting Fixtures,3. Construction Of A Section Of The Yakxs 4X120mm2 Power Supply Cable Line To Power A Separate Lighting Cable Line, Including The Installation Of A Cable And Measurement Connector And The Som3.4 Control Cabinet. Reconstruction Of Overhead And Low- And Medium-Voltage Cable Lines Managed By Pge Dystrybucja S.A. Busko Energy District, Colliding With The Planned Road Infrastructure. In The Case Of Construction Works Concerning The Reconstruction Of Networks Such As: Gas, Energy And Water Networks, The Costs Of Supervision Of Paid Overvoltages, Switching And The Costs Of Temporary Exclusion Of The Infrastructure In Question In Accordance With The Conditions Specified In The Decisions And Arrangements Should Be Taken Into Account Industry Regulations Issued By Network Operators. Task Carried Out Under The Government Road Development Fund - 2024 Edition. Guidelines And Comments Of The Employer: - Materials From Demolition Works, The Condition Of Which Allows For Re-Installation (Curbs, Edges, Concrete Blocks, Paving Slabs, Concrete Paving Stones, Etc.) Should Be Placed On Pallets, Wrapped In Foil And Transported To The Ordering Partys Storage Yard At Ul. Langiewicz. Distance From The Investment Site To The Storage Site At Ul. Langiewicza Is 3.5 Km. The Costs Of Completing The Task Should Therefore Include The Costs Of Purchasing Pallets And Foil, As Well As The Costs Of Loading, Transporting And Unloading To The Storage Yard. - The Debris From The Milling Of The Bituminous Surface Should Be Transported To The Employers Storage Yard At Ul. Langiewicz. The Costs Of Completing The Task Should Therefore Include The Costs Of Loading, Transporting And Unloading To The Storage Yard. Distance From The Investment Site To The Storage Site At Ul. Langiewicza Is 5.0 Km; - The Contractor Is Obliged To Prepare A Material And Financial Schedule Of Construction Works In Two Copies And Submit It To The Ordering Party Within 7 Days Of Signing The Contract. The Ordering Party Informs That The Schedule In Question Must Take Into Account The Timely Execution Of The Subject Of The Order, The Division Of Works, Taking Into Account The Order Of Implementation Of Individual Construction Industries, The Availability Of The Ordering Partys Budget, Including Tranches Of Co-Financing Based On The Contract And The Schedule For The Transfer Of Funds With The Świętokrzyskie Voivode, As Well As Minimizing Traffic Disruptions. Road In Connection With The Implementation Of The Task; When Preparing The Material And Financial Schedule For The Investment, The Contractor Must Take Into Account The Temporary Provision Of Part Of The Construction Site For The Manager Of The Gas And Water Supply Networks, I.E. Polska Spółka Gazownicza Sp. Z O. O. Branch: Zakład Gazowniczy W Kielce (Gazownia Busko-Zdrój) And Mpgk Sp. Z O. O. In Busko-Zdrój In Order To Reconstruct The Gas And Water Supply Networks Along With Connections To Buildings. - The Ordering Party Informs That It Does Not Guarantee A Place To Store Excess Earth From Excavations. Therefore, Finding Such A Place Is The Responsibility Of The Contractor;3. The Subject Of The Order Is Described In Detail In: 1) Design Documentation, Which Is An Annex To The Swz Containing: Construction Design; Technical Specifications For The Execution And Acceptance Of Construction Works; 2) Bills Of Quantities - Annex To The Swz.
|