3.1 Name Of The Order: Development Of Design Documentation For The Reconstruction And Expansion Of Municipal Roads Rozwózin - Dąbrowice, Będzymin - Rzężawy (Reconstruction And Expansion Of Municipal Road No. 460616W Będzymin - Rzężawy)The Subject Of The Order Is The Development Of Design Documentation Together With Obtaining A Final Building Permit On Behalf Of The Ordering Party. /Or Construction Notification: Reconstruction And Expansion Of The Municipal Road No. 460616W Będzymin - Rzężawy3.2 The Scope Of The Study Includes: Development Of Design Documentation Reconstruction And Expansion Of The Municipal Road No. 460616W Będzymin - Rzężawy Length Of The Road Section: Approx. 1,860 M Plot No. 82 Located In The Town Będzymin And Plot No. 237, 276 Located In The Town Of Rzężawy, Żuromin Communelocation - App. No. 1 To Swz3.3 Subject Of The Order And Obligations Of The Contractor: A) Development Of A Land Development Concept Along With A Proposal Of The Construction And Material Solutions Used (Longitudinal And Transverse Sections). The Concepts Should Be Submitted For The Employers Approval. B) Obtaining Current Maps Necessary To Develop The Construction Design; C) Current Extracts And Extracts From The Land Register Map Regarding The Investment; D) Development Of A Complete Construction Design: Land Development Design, Architectural And Construction Design (4 Copies), Technical Design Covering The Road Industry (4 Copies) And Detailed Design (4 Copies) Including All Annexes, Decisions, Opinions And Arrangements, And Obtaining The Final Decision, Building Permit/Or Construction Notification In Accordance With Applicable Regulations And Technical Knowledge; E) Preparation Of Bills Of Quantities And Investor Cost Estimates Necessary For The Ordering Party To Award An Order For The Implementation Of Construction Works - 2 Copies; F) Technical Specifications (General And Detailed) For The Execution And Acceptance Of Construction Works Covered By The Subject Of The Order, In Accordance With Chapter 3 Of The Regulation Of The Minister Of Infrastructure Of 2 September 2004 Regarding The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program - 2 Copies; G) Developing A Plan For Cutting Down Trees And Shrubs Together With Obtaining Cutting Permits (Included In The Decision Authorizing Cutting) - As Needed; H) Providing An Editable Electronic Version For Completed: Designs (Dxf. Or Dwg. Format), Investor Bills Of Quantities And Cost Estimates (Ath. Or Xlsx. Format) And Technical Specifications (Doc. Format);I) Participation Without Additional Remuneration In The Tender Procedure For Works Carried Out On The Basis Of Design Documentation, The Development Of Which Is The Subject Of The Order, In Particular By Answering Contractors Questions Regarding The Design Documentation In Question Within The Deadline Specified By The Ordering Party;J) Performing Geotechnical Tests Of The Subsoil, To The Extent Necessary To Develop The Documentation Design, Which Is The Subject Of The Contract In Accordance With Applicable Regulations In This Regard And Technical Knowledge; K) The Contractor Is Obliged To Provide Answers, Explanations, Information Regarding Solutions In The Design Documentation Directed By The Construction Manager And Other Participants Of The Construction Process; L) In The Event Of Additional Works And Those Necessary Resulting From A Design Error, The Contractor, At The Request Of The Construction Manager, Will Be Obliged, Without Additional Remuneration, To Develop Replacement And Additional Designs If Necessary; M) The Contractor Will Be Obliged In The Event Of An Appeal And Initiating The Appeal Procedure, Also In The Case Of A Decision With The Rigor Immediate Feasibility, To Provide All Explanations, Additions And Corrections To The Documentation Within The Deadlines Set By The Relevant Administrative Authorities;N) The Subject Of The Order Must Be Performed In Accordance With Applicable Regulations And Standards, Principles Of Technical Knowledge And Possible Instructions And Recommendations Of The Ordering Party, I.E., Among Others: Z.: - Act Of July 7, 1994 Construction Law, - Regulation Of The Minister Of Infrastructure Of September 2, 2004 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program, - Regulation Minister Of Development Of September 11, 2020 On The Detailed Scope And Form Of The Construction Project, - Regulation Of The Minister Of Infrastructure Of June 24, 2022 On Technical And Construction Regulations Regarding Public Roads - Act Of March 21, 1985 On Public Roads ,- Regulation Of The Minister Of Infrastructure Of May 18, 2004 On Determining The Methods And Basis For Preparing An Investors Cost Estimate, Calculating The Planned Costs Of Design Works And The Planned Costs Of Construction Works Specified In The Functional And Utility Program. In The Event Of A Change In The Provisions In Force On The Date Of Conclusion Of The Contract Or Entry Into Into Force Of The New Regulations, Individual Materials Must Be Developed And Decisions Must Be Obtained In Accordance With The New Legal Regulations.3.4 Editorial Requirements For Design Documentation: A) Complete Design Documentation Provided Along With Arrangements In The Number Of Copies Specified In Point. 3.3 Is To Be In Paper Form In Folders With A Description In Polish And On A Cd-Rom In One Copy; B) Drawings Should Be Saved In *Pdf Or *Jpg And *Dwgc Format) Technical Specifications Should Be Saved In A Commonly Used Text Editor In *Doc And *Pdfd Format) Bills Of Quantities Are To Be Saved In A Common Text Editor In *.Doc, *.Xls Or *.Athe Format) Investor Cost Estimates Should Be Saved In The Cost Estimation Program In *.Doc, *.Pdf Or * Format .Athf) All Reconciliation Documents, Decisions, Opinions, Etc., Are To Be Scanned And Attached To The Documentation Provided On A Cd-Rom. A Detailed Description Of The Subject Of The Contract In Point 3 Of The Swz
|