The Subject Of The Order Is The Development Of The Park Area. M. Matysiaka In Pyrzyce - Stage Iii .2. The Order Includes The Construction Of Park Alleys With A Gravel Surface And The Connection Between The Park Alley And The Sidewalk. Alleys 2.0 To 3.0 M Wide. The Sidewalk Connecting The Park Alleys Is Made Of 3.0 M Wide Concrete Cubes, And The Square Is Made Of 5.0 X 6.0 M Concrete Cubes. The Task Also Includes Replacing The Surface Of The Stairs And The Area Around The Monument, As Well As Carrying Out Maintenance Works On The Existing Wall And Monument. As Part Of The Task, Small Architecture And Plantings Should Be Installed. The Scope Of Work Includes: 1) Gravel Surface - 1053.00 M22) Square Next To The Sidewalk - 647.00 M23) Concrete Pavement - 79.00 M24) Delivery And Assembly Of Benches Mounted On The Wall - 46.00 M5) Delivery And Assembly Of The Bench Park - 3 Pcs.6) Delivery And Assembly Of Childrens Benches - 6 Pcs.7) Delivery And Assembly Of Waste Bins - 3 Pcs.8) Delivery And Assembly Of Flower Pots Along With Planting Ornamental Plants - 4 Pcs.9) Delivery And Assembly On Concrete Pedestal Of The Monument Of The Coat Of Arms Of The Pyrzyce Commune - 2 Pcs. 3. The Detailed Scope Of The Subject Of The Order, Program Assumptions And The Standard Of Execution Were Specified In The Design Documentation Constituting Annex No. 6 To The Swz, And The Bill Of Quantities Constituting Annex No. 8 To The Swz. The Remaining Terms And Conditions Of The Contract Are Specified In The Contract Template Constituting Annex No. 5 To The Swzz. Due To The Lump-Sum Nature Of The Remuneration, The Scope Of Works Provided By The Ordering Party (Appendix No. 8, Bill Of Quantities) Is Not The Basis For The Valuation Of The Works, But Constitutes Only Auxiliary Material. The Ordering Party Recommends Carrying Out An On-Site Inspection. In The Field At The Contractors Own Expense. Moreover, The Subject Of The Order Includes: 1) The Cost Of Securing The Construction Site And Maintaining The Construction Facilities, 2) As-Built Documentation, 3) The Cost Of Electricity And Water And Other Utilities Necessary To Complete The Task. 4) Informing Users In Advance About Communication Difficulties Related To With The Progress Of Work And Providing Appropriate Security And Marking Of The Work Area, 5) Other Costs Necessary To Perform The Subject Of The Contract, If The Contractor, Acting With The Utmost Care Appropriate To A Professional, Should Have Anticipated Them.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78435432
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.