Mei3012 - Meise, Connection Groen Kluster Oppemstraat-Klepperstraat The Project Concerns The Connection Of The Green Clusters Oppemstraat - Klepperstraat To The Sewerage In Stationsstraat. By Constructing A Separate System (New Dwa, Retention Of Rwa), The Wastewater Will Be Connected To The Merchtem Wwtp And The Rainwater Will Connect To The Molenbeek (2Nd Category Watercourse) After Infiltration. To Achieve This, A Separate System Will Be Constructed According To The Principle Of 2Dwa Sewerage (100% Disconnection). • The Waste Water From Oppemstraat, Groeneweg, Klepperstraat And Brussegemsesteenweg Is Connected To The Existing Public Sewerage At The Intersection Of Brussegemsesteenweg / Oppemstraat. • The Rainwater In The Oppemstraat Will Infiltrate Into The Sub-Foundation Through Infiltration Gullies And Infiltration Gutters. In Order To Make Optimal Use Of The Sub-Foundation As A Buffer Volume, A Barrier Will Be Placed Every 15 M. • There Is Currently No Sewerage In Klepperstraat And Groeneweg At Homes 22/24 And Oude Oppemstraat 22, And No Rwa Pipe Will Be Provided Here In The Future. • At The Houses Brussegemsesteenweg 7 To 15, The Existing Sewerage Drains To The Intersection Brussegemsesteenweg/Oppemstraat. In The Brussegemsestenweg, 100% Focus Will Also Be On Infiltration Via The Sub-Foundation. Infiltration Gullies And Infiltration Channels Will Also Be Installed Here. An Adjacent Elevated Cycle Path Will Be Provided Along The Route. The Streets Are Being Redeveloped With Asphalt Paving.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78386716
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.