The Subject Of The Order Are Construction Works Covering The Renovation Of Communication Zones On The First Floor, Consisting Of: Replacing Door Joinery, Repairing The Floor, Casing Sewage Risers, Painting The Ceiling And Walls, Installing Emergency And Evacuation Lighting Along With Installing Cable Trays On The Main Communication Route, In Particular: 1. Scope Of Construction Works: - Forging Door Frames, - Dismantling Internal Doors, - Delivery And Installation Of Internal Doors With Necessary Accompanying Works, - Delivery And Installation Of Strip Door Closers, - Delivery Of Internal Doors, - Construction Of Casing For Installation Risers, - Painting Ceilings And Walls With Emulsion Paint With Preparation Of The Surface, Painting The Paneling With Colorless Polyurethane Varnish And Preparing The Surface, Replacement Of Ventilation Grilles, Installation Of Door Signs, Partial Renovation Of Floors, Installation Of Threshold Strips, Construction Of Installation Culverts For Rooms, Disposal And Removal Of Demolition Material.2. Scope Of Electrical Installation Works: - Disassembly Of Emergency Lighting Fixtures, - Installation Of Junction Boxes, - Punching Holes, - Installation Of Cable Ducts, - Forging Grooves, - Grouting Of Grooves, - Mechanical Creation Of Blind Holes, - Inserting Plastic Pins, - Installation Of Installation Trays, - Laying Cables, Installation Of Cable Lugs, Disposal And Removal Of Demolition Material. Note: 1. During The Assembly Of The Installation Trays, The Contractor Will Provide 14 Penetrations To The Classrooms Along With Secured Culverts For Later Use.2. The Ordering Party Requires That The Installed Door Joinery Be Consistent With The Joinery Installed In The First Stage (2Nd Floor). The Contractor Will Perform All Construction Works, Deliveries And Other Activities In Accordance With The Purpose Of The Investment, The Description Of The Subject Of The Order Contained In The Swz, As Well As With The Documentation Of The Proceedings And Other Decisions Regarding Necessary For The Full Implementation And Acceptance Of The Investment - The Documents Listed By The Ordering Party Are Included In Annex No. 9 To The Swz.
|