The Subject Of The Public Contract Is The Execution Of Construction Works - Road Iii/45813 Albrechtice City - Opavice, I. Stage (Object No. 1) And The Sidewalk Along The Silos. Iii/45813 On Opavická Street, Albrechtice City (Object No. 2), The Building Will Be Realized As A Whole. Due To The Condition Of The Roadway Of Road Iii/45813, It Is Not Possible To Adequately Construct The Sidewalk In Advance Of The Roadway Reconstruction, Because The Current Shoulder Of The Roadway Cannot Be Technically Or Aesthetically Adapted To The Direction Or Height Of The Sidewalk. For This Reason, Both Projects Are Mutually Coordinated. Both Constructions Can Be Carried Out At The Same Time, Or The Sidewalk Can Be Completed Afterwards. The Building Is Located In The Moravian-Silesian Region, Cadastral Area: Kú Město Albrechtice. Division Of Construction Into Objects: Road Iii/45813 Town Of Albrechtice – Opavice, I. Stage (Object No. 1) The Total Length Of The Section Of Road Iii/45813 Designated For Repair Is 1055 M. The Scope Of The Repairs Is Divided Into Sections With Regard To The Different Condition Of The Road, Namely Sections Km 0.000 – 0.350 And 0.350 – 1.055. In The Km 0.000 – 0.350 Section, Existing Asphalt Layers Will Be Milled And New Ones Will Be Laid. In The Rest Of The Stage, The Existing Surface Will Be Milled And Reprofiled Using Cold Recycling Technologies In Thickness 160 Mm And Subsequent Completion Of Two Layers Of Asphalt Concrete In Total Thickness. 100 Mm. At The Same Time, The Unification Of The Width Arrangement Will Be Carried Out To A Reinforcement Width Of 5.0 M. In Km 0.000 - 0.350 There Is A Road With A Cover Of Compacted Asphalt Layers, Where There Are Faults Such As Mosaic, Transverse, Longitudinal And Irregular Branched Cracks, Locally Also Network Cracks, , Irregular Bumps, Loss Of Asphalt Sealant To Deep Corrosion. On The Other Parts Of The Section With A Cover Made Of Penetrating Macadam With A Coating, The Road Surface Shows Practically All-Over Significant Structural Defects Such As Longitudinal Branched And Network Cracks, Surface Deformations And Local Subsidence, There Are Also Irregularities Forming Irregular Bumps, Potholes, Drainage Defects Such As A Raised Unpaved Shoulder And Silting Of Ditches And Other Disturbances. Part Of The Repair Will Also Be The Repair Of Non-Functional Drainage, Modification Of Unpaved Roadsides, Or Other Modifications Of Road Components And Accessories According To The Administrators Requirements. Acquisition Of Legal Force Of The Building Permit: 12/12/2023. Construction And Technical Condition Of The Road Surface: 5 Crossing With A Railway - It Is Necessary To Respect The Conditions Of The General Opinion On Construction Management Of The Railway Administration Of 17/03/2023 (No. 11485/2023-Sž-Oř Ova-Ops) And The Binding Opinion Of The Railway Office From 6/6/2023 (No. Ducr-35330/23/ Bt). Walkway Along Silos. Iii/45813 On Opavická Street, Albrechtice Town (Object No. 2) The Route Starts At The Intersection Of Opavická X Jiráskova Streets, Where It Connects To The Current Pedestrian Routes At The Crossing Point And Then Leads To The Last House Of The Family Development In The Village At The Left Edge Of The Road. The Length Of The Treated Section Is 600 M, And About Half Of The Length, The Sidewalk Is Interrupted By A Crossing With Railway Line No. 292 Albrechtice City – Krnov. The Pavement Surface Will Be Made Of Gray Concrete And Granite Paving, The Curbs Will Be Concrete And Granite, Tactile Elements Will Be Made Of Red Relief Paving. Pedestrian Access 2.0 M Wide, Which Will Be Lined With Curbs And With A Surface Of Interlocking Paving. Modifications Of Paved Or Unpaved Slopes Will Also Be Included. Coordination: As Part Of Another Event, Disassembly Will Take Place Incl. Relocation Of Vo Columns. Need To Coordinate! The Project Preparation Of The Transfer Of The Vo Is Handled Separately. According To A Statement From The City Of Albrechtice, After The Construction Site Has Been Marked Out, The City Will Use Its Own Workers To Relocate It. The Building Permit Became Legally Binding: 25/05/2023. Intersection With The Track. It Is Necessary To Respect The Conditions Of The Summary Opinion On Common Territoriality And Construction Procedure Of The Railway Administration From 26.8.2022 (No. 30159/2022-Sž-Oř Ova-Ops) And The Binding Opinion Of The Railway Authority From 31.1.2023 (No. Ducr-6483/23/Hn). Closure Of Traffic: A Complete Closure For Object No. 1 Is Expected, Public Transport Will Be Excluded From The Construction. (Before The Start, The Contractor Will Discuss Alternative Public Transport, Possibly Temporary Cancellation Of The Line.) In The Pd There Is An Item For The Transfer Of The Affected Lines To Silo I/57. A Partial Closure For Object No. 2 Is Assumed.
|