Architectural, Engineering And Planning Services – Fraunhofer Ivv Dresden - 70-00311-2540-A Object Planning Buildings. A New Institute Building Is Planned At The East Science Location In Dresden-Reick. The Measure Is Financed By The European Regional Development Fund (Erdf), The Federal Government And The Free State Of Saxony. Due To The Specific Requirements Involved, Applicants Are Expected To Have Experience In Handling Public Funding Construction Measures. The Requirements From The Rzbau (Guidelines For The Implementation Of Subsidized Construction Measures) As Well As The Specifications Resulting From The Erdf Fund For A Limited Project Duration Until September 2028 (Billing Deadline) Must Be Taken Into Account When Processing The Project. The Planned New Building Will Accommodate, Among Other Things, Office, Conference, Physics Laboratories And Technical Center Space For 114 Employees. This Requires 3,138 M² Of Usable Space (Nuf 1-6) With The Appropriate Infrastructure. Sustainability Certification According To Bnb Is Not Required. In Connection With The Use Of Erdf Funding, The Climate Compatibility Of The Measure Must Be Checked And Proven During The Course Of The Project. As A Recipient Of Public Funds, The Fraunhofer-Gesellschaft Attaches Great Importance To The Implementation Of An Innovative, Sustainable And Resource-Saving, But At The Same Time Economical Building, Energy And Operating Concept. Applicants Are Therefore Expected To Provide Contributions That Meet The Above Requirements And Are Chosen In Terms Of Complexity And Construction So That The Measure Can Be Safely Constructed And Billed Within The Specified Project Duration. Contract: Implementation Of Construction Planning Services For The Object Planning Building For The Fraunhofer Ivv Dresden - New Construction Of The Processing Technology Department, Total Costs Kg 200-700 (Excluding Initial Equipment) Max. 25,300,000 Net (Excluding Vat) In Accordance With Ii.2.4). The Project Is Implemented Using The Zbau Process, Including The Creation Of An Application And Construction Document As Well As A Concept Discussion With The Donors. Fixed Price Contract! Fee According To Hoai According To The Rbbau Model Contracts. Gradual Commissioning Of Service Phases 2-4 And 5-8 Hoai In Accordance With The Rbbau Model Contracts. Order Lph 5-8 At The Earliest Upon Receipt Of The Approved Application And Construction Documents. Fee Zone (§35 Hoai): 4, Fee Rate (§35 Hoai): Minimum Rate Amount Of Additional Costs: According To Rift-Bund In The Latest Version The Conversion Surcharge Is (%): None The Building Structure To Be Processed Will Be Remunerated As Follows: No Building Structure To Be Processed Options: The Client Reserves The Right To Later Commission The Following Optional Services: Approximately 25-33% Of The Property Area Is Intended For A Later Expansion Of The Building Structure.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 78286878
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.