Construction Work - Execution Of Construction Works Involving The Construction Of The Himalayan Mountaineering Center. Jerzy Kukuczka In Katowice Along With The Implementation Of Construction Works In The Field Of Option Law As Part Of The Investment Project Entitled: Himalayan Center Named After Jerzy Kukuczka.. Execution Of Construction Works Involving The Construction Of The Himalayan Mountaineering Center. Jerzy Kukuczka In Katowice Along With The Implementation Of Construction Works In The Field Of Option Law As Part Of The Investment Project Entitled: Himalayan Center Named After Jerzy Kukuczka. As Part Of The Order, The Contractor Is Obliged To: 1. Comprehensive Performance Of Construction Works Based On The Prepared Documentation Of The Himalayan Mountaineering Center. Jerzy Kukuczka In Katowice At Ul. Katowicka And Ul. Markiefki. The Scope Of The Investment Includes: - Expansion, Superstructure And Reconstruction Along With Changes In Use (Intended For Culture, Sports, Catering, Services/Public Utilities) Of Multi-Family Residential Buildings: At Ul. Katowicka 3 And Ul. Markiefki 96, Construction Of A New Cubature Part To Functionally Connect The Existing Buildings Into One Facility, The Himalayan Mountaineering Center. Jerzy Kukuczka, Development Of The Area Around The Building, Road Infrastructure, Technical Infrastructure. The Himalayan Center Was Designed As A Facility With The Following Parameters: Building Area: 1,721.70 M2, Usable Area: 3,829.70 M2, Gross Volume: 27,929.27 M3. Number Of Floors: Number Of Above-Ground Floors: 3. Number Of Underground Floors: 1. The Subject Of The Order Is The Performance Of Construction Works In The Field Of, Among Others: Preparatory Works, Demolition Works, Earthworks, Structures, Floors, Walls, Plasters, Ceilings, Finishing Works, Joinery And Joinery, Roof, Façade, Water Connection, Rainwater Drainage, Sanitary Sewage, Internal Water And Sewage Installations, Central Heating Installations, Ventilation And Air Conditioning Installations, Electrical Installations And Photovoltaic Devices, Area Lighting, Structured Cabling Installations, Video Monitoring Installations, Sound System Installations, Building Management System, Alarm System, Fire Alarm System, Access Control System, Small Architecture, Pavement, Road Infrastructure, Retention Reservoir, Felling Of Trees, Greenery, Replacement Plantings, Construction Of A Transformer Station, Reconstruction And Expansion Of The Power Grid, Reconstruction Of A Section Of The Street. Markiefka Consisting In The Demolition Of The Sidewalk And The Construction Of A Fragment Of The Road, And The Spacer Of A Fragment Of The Gas Network. 2. Construction Works Related To The Implementation Of The Climbing Zone Based On Documentation Prepared By The Contractor In The Design And Build Formula In Accordance With The Functional And Utility Program, Including Authors Supervision Over The Implementation. The Detailed Scope Of Work Is Specified In: Design Documentation - Annex No. 10, Functional And Operational Program Of The Climbing Zone - Annex No. 10A, Technical Specifications For The Execution And Acceptance Of Construction Works - Annex No. 11, Bill Of Quantities - Annex No. 12, Designed Contractual Provisions - Annex No. 9, Conditions For Carrying Out Works - Annex No. 13. 3. Scope Of The Order Covered By The Option Right: In Frame
|