The Subject Of The Order Is: Construction Of The Crisis Management Center In Wysoka - Stage I. The Investment Is Carried Out In The Design And Build Formula. Stage I Includes The Design And Construction Of The Crisis Management Center In Wysoka, Which Includes: - Administrative And Social Building With Garages Of The Volunteer Fire Department In Wysoka. - Administrative Building Of The Municipal Utilities Department In Wysoka. The Scope Of The Project Includes: 1. Development Of An Architectural And Construction Design For The Construction Of Buildings That Are The Subject Of The Study, Together With Internal Sanitary Installations (Hot And Cold Water, Domestic Hot Water With Hot Water Tanks, Central Heating (Partly Underfloor Heating, Partly Using Heaters, Gravity Ventilation, Mechanical Ventilation, Supply And Exhaust Ventilation) With Heat Recovery And Sanitary Sewage, Internal Electrical, Telecommunications And Fire Protection Installations (Emergency And Evacuation Lighting, Installation Of Internal Fire Hydrants, Smoke Removal Installation For Staircases), External Lighting Of The Area, Heating With A Ground Heat Pump And Installation Of A Photovoltaic Micro-Installation With A Power Of 35Kw.2. Preparation Of Technical Designs (Architecture, Structure, Sanitary Installations, Electrical Installations, Telecommunications Installations - Monitoring, Burglary, Computer, Internet, Sound System, Radio Mast). 3. Preparation Of Executive Designs, If Necessary. 4. Development Of A Road Design For Paved Surfaces And Communication.5. Development Of An Area Development Project For Plot No. 491.6. Preparation Of Bills Of Quantities And Investor Cost Estimates For All Industries,7. Development Of Technical Specifications For The Execution And Acceptance Of Works,8. Development Of Guidelines Regarding Bioz And Bioz Plan At The Construction Stage,9. If Necessary, Preparation Of Necessary Technical Expertise, Research, Excavations, Etc. 10. The Scope Of The Project Also Includes Obtaining The Necessary Agreements On The Method Of Execution And Scope Of Construction And Assembly Works, As Well As Acceptance Of The Completed Works. Design Documentation Requires Agreement And Approval By The Ordering Party. Documentation And Other Studies Should Be Prepared In The Required Number Of Copies. You Must Submit 5 Copies Of The Architectural And Construction Design, 5 Copies Of The Land Development Design And 5 Copies Of The Technical Design (And Executive Design, If Necessary. After Developing And Agreeing On The Architectural And Construction Design And Pzt, You Must Obtain The Necessary Administrative Decisions And Consents, Based On Which The Project Must Be Implemented. During The Implementation Of The Project, All Legally Required Documents, Opinions, Research And Test Results Should Also Be Obtained, As Well As Those Necessary To Obtain The Consent Of The Competent Authorities In The Event Of Such An Obligation And/Or Obtain A Permit To Use The Facilities. The Basis For Developing Documentation Design And Cost Estimate, The Architectural Concept And The Functional And Utility Program Are Attached By The Ordering Party. The Construction Stage Includes: A) In The Administrative And Social Building With Garages For The Volunteer Fire Department: Administrative Rooms, Cloakrooms With Sanitary Facilities, Toilets, Generally Accessible, Including For Disabled People, A Control Room, A Room Technical Heat Pumps, So-Called Dirty And Laundry Rooms, Communication With The Staircase, Training Room - Meeting Room With Social Rooms, Kitchenette With Meeting Room Facilities. The Building Is Fully Adapted On All Floors For Disabled People And People With Limited Mobility. B) In The Administrative And Social Building Of The Municipal Utilities Department: Administrative And Social Rooms, Toilets, For Staff And Customers, Including One Adapted For Disabled People, Technical Room For A Heat Pump , Utility Room, Customer Service Room, Secret Office And Server Room, General Communication, Passenger Elevator For 6 People, Including One Adapted For Disabled People, The Entire Building Is Adapted On All Floors For Disabled People And People With Limited Mobility. Moreover: - Purchase And Delivery Of A Permanent, Free-Standing Generator And A Mobile Generator With A Maximum Power Of 53Kw, Separately For Each, Using Diesel Fuel En590. - Purchase And Delivery Of Two Barrel Tankers On A Truck Body With A Barrel Capacity Of 5,000 Liters.
|