The Subject Of The Order Is: Performance Of The Task Titled: Renovation Of Bathrooms In Kwp Zs. In Radom” - Works Will Be Performed In An Active Facility. Address To Which The Order Applies: Kwp Radom, Ul. 11Go Listopada 37-59, 26-600 Radom. The Work Will Be Performed During The 24-Hour Operation Of The Provincial Police Headquarters Based In Radom, The Scope Of Work Should Be Agreed With The User On An Ongoing Basis. The Contractor Bears Full Responsibility For The Construction Site. From The Moment Of Taking Over The Construction Site. The Contractor Whose Offer Is Selected Before Signing The Contract Is Obliged To Submit A Simplified Cost Estimate To The Ordering Party For Information Purposes. Technical Description Basis For The Study - Regulation Of The Minister Of Development Of September 11, 2020. On The Detailed Scope And Form Of The Construction Project (I.E. Journal Of Laws Of 2022, Item 1679), - Regulation Of The Minister Of Infrastructure On The Technical Conditions To Be Met By Buildings And Their Location Of April 12, 2002 (I.E. Journal Of Laws Of 2022, Item 1225), - Bill Of Quantities, - Applicable Polish And European Standards And Regulations, Principles Of Technical Knowledge Related To The Construction Process, Scope Of Works Execution Of Works In Accordance With Bills Of Quantities And Swz. The Obligation To Complete And Deliver Acceptance Documents On The Date Of Commencement Of Acceptance Rests With Contractors. The Contractor Is Required To Perform: Scope Of Works - Renovation Of Sanitary Sewage Systems And Bathrooms Sanitary Installations Industry: Cleaning Of Sanitary Sewage Risers Cleaning Of Approaches To Sanitary Facilities Cleaning Of Sanitary Sewerage Drains Replacement Of Sections Of Sanitary Sewage Risers And Approaches Replacement Of Sanitary Equipment In Bathrooms Construction Industry : Dismantling Floors And Wall Cladding With Ceramic Tiles, Filling Defects In Concrete Surfaces Leveling Layers For Cement Mortar Floors Floor Coverings Made Of Artificial Stone Tiles Of Regular Shapes On Thin-Layer Adhesive Mortar; Wall Cladding With Tiles On Adhesive Mortar Pointing Of Ceramic Tiles With Colored Grout Cleaning And Painting Ceilings And Walls With Emulsion Paints Installation Of Panel Doors Suspended Ceilings With Mineral Fiber Boards With 600X600 Mm Grids Aluminum Walls, Internal Walls System. Electrical Industry: Before Commencing Construction Works, Dismantle Lighting Fixtures, Light Switches And Electrical Sockets. Protect Cables Appropriately. Reinstall Fixtures, Switches And Sockets After Construction Works. Replace Two Fixtures In Suspended Ceilings With Led Fixtures In Accordance With Bill Of Quantities. Measure The Effectiveness Of Anti-Shock Protection. To Perform The Works, Use All Materials That Are Brand New And Have The Required Certificates, Certificates Of Suitability And Approvals. On The Date Of Acceptance, The Contractor Will Complete Material Cards, Certificates And Declarations Of Performance For All Incorporated Materials And Deliver Them To The Ordering Party. The Contractor Is Obliged To Have Insurance Against Civil Liability In Tort For Personal And Property Damage In The Scope Of Activities Related To The Subject Of The Contract And No Later Than On The Date Of Conclusion Of The Contract. Submit A Copy Of The Insurance Policy To The Ordering Party. Waste And Excess Materials From Construction Works Become The Property Of The Contractor And He Is Obliged To Remove Them From The Construction Site And Handle Them In Accordance With Applicable Regulations. Recoveries Classified As Waste By The Ordering Party Also Become The Property Of The Contractor And Are Subject To Disposal. The Contractor Will Provide The Ordering Party With Documents Confirming Disposal. Steel And Cast Iron Scrap From Dismantling Carried Out During The Implementation Of The Subject Of The Contract Is The Property Of The Ordering Party. The Contractor Is Obliged To Deliver It To The Scrap Collection Point Indicated By The Ordering Party And Immediately Provide The Ordering Party With A Document Confirming The Receipt Of Scrap By The Collection Point, In Order For The Ordering Party To Issue An Invoice For This Collection Point. The Fee For The Sale Of Scrap Will Constitute The Ordering Partys Income. The Contractor Undertakes To Dispose Of Waste In Accordance With Applicable Law, In Particular The Act Of December 14, 2012. On Waste (I.E. Journal Of Laws Of 2023, Item 1587, As Amended) And The Act Of April 27, 2001 Environmental Protection Law (I.E. Journal Of Laws Of 2022, Item 2556, As Amended). Bdo Register Number For The Provincial Police Headquarters Zs. In Radom: 000311503. Attention! – Local Visition Before Submitting The Offer, The Ordering Party Recommends To Carry Out A Site Visit In The Rooms Where Construction Works Are Planned To Be Carried Out, At A Time Convenient For The Contractor And The Ordering Party, After Setting The Date Of The On-Site Visit By Telephone. The Ordering Party Expects A Prior Telephone Declaration From The Contractor Interested In Carrying Out An On-Site Visit. In Order To To Arrange An Individual Date For An On-Site Visit, Please Contact The Supervision Inspector By Phone From Monday To Friday From: From 8.30 To 15.30 To The Number: (47) 701 23 53. With Regard To The Condition Specified In Art. 100 Of The Public Procurement Act Regarding Accessibility For Persons With Disabilities, Referred To In Directive 2014/24/Eu Of The European Parliament And Of The Council Of 26 February 2014 On Public Procurement (Oj Eu L No. 94, P. 65), The Contracting Authority Informs That The Description Of The Subject Of The Order Does Not Take Into Account The Requirements Regarding Accessibility For Disabled People Or Design For All Users, As This Is Not Possible Due To The Scope Of Works Covered By The Procedure - Renovation Of Bathrooms Used Only By Police Officers And Employees (Not Applicable) .The Ordering Party Requires That The Contractor With Whom The Contract For The Execution Of The Order In Question Will Be Concluded Ensures That In The Case Of Subcontracting Or Further Subcontracting Contracts, Security For The Proper Performance Of The Contract Is Submitted By The Subcontractor Or Further Subcontractor Before Concluding The Subcontracting Or Further Subcontracting Contract. Conditions Of Warranty And Warranty In Accordance With The Provisions Included In The Contract Proposal, I.E. In Annex No. 2 To The Contract. For The Subject Of The Contract, The Contractor Grants The Ordering Party At Least 5 Years Warranty, Counting From The Date Of Fault-Free Acceptance Of The Final Subject Of The Contract, And Undertakes To Remove Defects Arising During The Warranty Period At Its Own Expense, Within A Period No Longer Than 7 Calendar Days From The Date Of Notification By The Ordering Party. The Warranty Period Begins On The Day Following The Fault-Free Final Acceptance Of The Subject Of The Contract And Includes Material Defects And Workmanship Defects. Due To The Limited Number Of Characters, Other Information In The Above Scope Can Be Found On The Website Of The Ongoing Proceedings At Https://Platformazakupowa.Pl/Pn/Kwp_Radom
|