Construction Work – Renovation Of The Nvszlk Building. Iii Of Building E Of The Nógrád Vármegyei Szent Lázár Hospital. Establishment Of A Gastroenterology Laboratory And Screening Center On The First Floor, As Well As The Transformation Of An Ophthalmology Department With A One-Day Surgery Room. Area Affected By Building Renovation Is 911 M2. Architecture: - Floor Insulation 217.7 M - Wall Demolition 218 M2 - Suspended Ceiling Demolition 573 M3 - Floor Covering Replacement 922.8 M2 - Plastering, Painting 1,887 M2 - Door And Window Replacement 28 Pcs. Mobility-Restricting/ Toilet Equipment Behind Wall Level With Installation Stand, Flush Tank 1 Movement Limiter/ Wash Basin, Porcelain, With Faucet 3 Wc Equipment Behind Wall Level With Installation Stand, Flush Tank 2 Wc Equipment With Rear Outlet, Low-Mounted Geberit Flushing Tank 3 Wc Equipment With Bottom Outlet, Low-Mounted Geberit Flushing Tank 12 Washbasin, Porcelain, With Medical Faucet 10 Washbasins, Porcelain, With Two-Button Faucet 1 Washbasin, Porcelain, With Two-Button Faucet 3 Showers, With Mixing Faucet 12 Double-Basin, Stainless Sinks, With Medical Faucet 1 Potty/Bed Bowl, Porcelain, Mixer With Faucet, With Low-Mounted Geberit Flushing Tank, 2 Washing Machine Connections - Waste Water Drainage - Modernization Of Heating, Cooling, Air Conditioning (Air-Cooled Liquid Cooler, 3 New Air Handlers, Multiple Air Conditioners - Medical Gas Pipeline Construction) Electricity: - Renovation Of The Electrical System - Construction Of A New Fire Alarm System - Access Control, Video, Intercom , Tv - It And Telephone Network - Creation Of A Nurse Call System The Exact Quantities, The Detailed Definition Of The Construction Task, The Quality And Performance Requirements Are Contained In The Execution Plan That Is Part Of The Public Procurement Document, As Well As The Itemized Unpriced Budget Statement, Which Are Part Of The 3Rd Volume Of The Public Procurement Documents.
|