The Subject Of The Order Is The Thermal Modernization Of The Building Along With Changing The Heating Method At Ul. Janiego 57C In Rybnik. Scope Of The Subject Matter Of The Order: 1. General Construction Works (Thermal Insulation): 1) Preparation Of The Back Of The Work Area, 2) Securing The Work Area, 3) Replacement Of Windows And Doors, 4) Insulation And Insulation Of Basement Walls, 5) Insulation Of External Walls, 6) Roof Insulation.2. Accompanying Works: 1) Renovation Of Chimneys, 2) Re-Building Of Attics, 3) Replacement Of Gutters And Downpipes, 4) Adaptation Of The Exchange Room (Boiler Room) And The Corridor, 5) Renovation Of Staircases, 6) Renovation Of External Stairs, 7) Tidying Up The Work Area, 8) Removal And Disposal Of Demolition And Construction Materials.3. Installation Works: 1) Gas Installation: A) Making Punctures And Bricking Up Holes In The Walls, B) Installing Protective Sleeves, C) Making Steel Pipelines With Welded Connections, 2) Central Heating Installation: A) Making Stainless Steel Pipelines, B) Execution Galvanized Carbon Steel Pipelines, C) Insulation Of Pipelines With Laggings, D) Installation Of Fittings And Valves, E) Installation Of Radiators, F) Tests And Adjustments Of The Central Heating Installation, 3) Installation Of Domestic Hot Water: A) Installation Of Pipelines From Pe-Rt Pipes With Aluminum Insert, B) Insulation Of Pipelines With Lagging, C) Installation Of Electric Capacitive Water Heaters With A Capacity Of 80 Liters, D) White Installation, 4) Boiler Room Layout: A) Installation Of Gas Boilers, B) Installation Of Diaphragm Expansion Vessels, C) Installation Of Fittings And Valves, D) Installation Of Air And Exhaust Gas Ducts, E) Construction Of Concrete Wells For Hot Water, 5) Electrical Installation With Accessories: A) Installation Of Lighting Fixtures, B) Installation Of Emergency Lighting Fixtures, C) Installation Of Electrical Equipment, D) Laying Power Cables,E) Installation Of Switchboards,F) Measurement Of Lighting Intensity,G) Measurement Of Installation.4. Renovation Of Residential Premises: A2, A5, A8, B2, B7:1) General Construction Works: A) Demolition Works, B) Finishing, Bricklaying And Plastering Works, C) Painting Works, D) Removal And Disposal Of Demolition Materials.2) Works Installation: A) Water Supply And Sewage Installation: - Dismantling Works, - Assembly Works, - White Assembly, B) Electrical Installation: - Dismantling, - Laying Cables In Rooms, - Installation Of Electrical Installation Equipment, - Installation Of Tm Housing Board, - Installation Of Intercom System ,- Supplementary Works,- Removal And Disposal Of Demolition Materials. The Detailed Scope Of The Order Is Specified In: Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works, Bills Of Quantities Constituting Annexes To The Specifications Of The Terms Of The Order.
|