Heating, Ventilation And Air-Conditioning Installation Work – 14-Ar-24-036, New Building Middenhus, Kg 420 Heat Supply Systems. A Middenhus, House Of Possibilities, Is Being Built On Property Owned By The Municipality Of Bokholt-Hanredder. There Are Two Buildings Connected By A Roof. It Is Possible To View The Building Plot In Advance. Additional Demands Due To Ignorance Will Not Be Accepted. All Services Also Include The Delivery Of The Associated Materials And Components, Including Unloading And Storage In The Allocated Storage Areas, Unless Otherwise Described In The List Of Services. The Services Include - Heat Generation Systems - Heat Distribution Networks - Space Heating Surfaces. The Heat Is Supplied To The Buildings Via Air-Water Heat Pumps For Outdoor Installation With A Total Nominal Heat Output Of Approx. 55 Kw With A System Temperature Of 45/35 Degrees. The Air-Water Heat Pumps Are Installed In The Area Of The Planned Bicycle Rack System In House 2. The Supply And Return Connection Of The Heat Pumps To The Heating Distribution In House 2 With Their Own Circulation Pumps, The Power Supply To The Heat Pumps And The Device Connection To The Ddc Technology Are Carried Out Via Underground Lines Up To The House Connection Room In House 2. Pressure-Water-Tight Wall Ducts Are Provided For The Building Entries. In The Boiler Room, A Sufficiently Large Buffer Storage Tank Is Set Up In The Boiler Room To Ensure Economical Operation Of The Heat Pumps Over The Outside Temperature Range To Be Covered For Heating The Building. For The Defrosting Operation Of The Air-Water Heat Pumps At Low Outside Temperatures, The Buffer Tank Is Additionally Equipped With An Electric Heating Element. The Heating Circuits For Heating The Building Are Connected Via A Differential Pressure-Free Distributor. Individual Protection Of The Heat Pumps And Protection Of The Entire System Against Overpressure Is Carried Out Via Membrane Expansion Vessels And Spring-Loaded Safety Valves. Hot Water Is Prepared Decentrally Via Electrical Storage Or Instantaneous Water Heaters. The Heat Distribution Networks Are Set Up In A Two-Pipe System. Starting From The Differential Pressure-Free Distributor Of The Buffer Tank In The House Connection Room In House 2, The Distribution Of The Flow And Return Lines To The Individual Heating Groups For Local Heating In House 1 As Well As The Static And Dynamic Heating In House 2 Takes Place. The Distribution To The Heating Groups In House 1 Is Arranged In The Storage Room. For Static Heating And Individual Room Control Of The Office 2.05 Daycare Staff, 2.20 Daycare Management, The Arrangement Of Valve Plate Radiators With A Flat Front And Central Connection Is Planned. The Kitchen In House 1 And The Associated Storage Room Are Heated With Hygienic Radiators Without Convectors And A Flat Front And Central Connection. For The Necessary Heating Of The Storage And Storage Rooms 1.03 And 1.04 In House 1 As Well As To Keep The Technical Room 2.02 In House 2 Frost-Free With The Necessary House Connections For The Overall Construction Of The House Connection Room, Valve Panel Radiators With Profiles Are Used
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 77969257
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.