Architectural, Engineering And Surveying Services – Nb Qualmdeiche Saaledeich Li. Km 0.0 - 5.5 (Draft Measurement). Carrying Out A Design Survey Along The Left Main Dike Of The Saale Between Tornitz And Barby. - Surveying In The Official Position And Height System (Position Reference System: Etrs89 Utm, Zone 32; The Utm Coordinates Must Be Supplied In 6 Digits; Height Reference System: Dhhn2016) - Exploration, Marking And Determination Of Position And Height Reference Points - Digital Terrain Survey With Break Edges As 3D Polylines For Area Recording Including Vegetation And Individual Tree Recording (Outside Designated Forest Areas) For Potential Soil Extraction Points And Storage Areas, Approx. 10 Ha, Predominantly Free Of Vegetation (Fields); Area Survey Including Vegetation And Individual Trees (Outside Designated Forest Areas) Dike Routes Approx. 100 M Wide; Building Standard 8 Weirs, 29 Sluices And Culverts, 1 Railway Culvert, Etc. With Water Section; Water Development Routes With Bottom, Embankments, Stationing, Top Edge Of The Embankment And Distant Terrain Point (10 M), Individual Trees And Vegetation And New Water Construction Routes, Such As Dyke Routes, Recording Width Approx. 40 M - Dyke And Path Routes Surveyed In A Cross-Sectional Manner, Cross-Section Distance Max. 25M. In Curved Sections, The Cross-Section Distance Must Be Reduced. For The Formation Of Break Edges (Embankment Edges, Embankment Bends, Path Edges, Etc.), The Point Spacing Must Be Chosen So That Realistic Modeling Is Possible (Minimum Point Spacing = 2M In Curves). All Break Edges Must Be Designed As 3D Polylines And Triangular Meshes Must Be Tightly Meshed. - Measure Connections, Intersections Of Paths, Streets, Etc. Up To At Least 50 M From The Route Survey - Record All Existing Ramps, Paths In The Examination Area - Record The Position And Height Of Trenches As Well As Cross Profiles (Max. A = 100 M), - Sole (Left, Right, Axis), With Bed Width > 1.5 M Point Compaction - Slope Ok, Plus If Necessary. Changes In Inclination, Berms, Etc., - Distant Terrain Left And Right, 5 M And 10 M Each - Current Water Level - Vegetation In The Strip Of Distant Terrain 10 M Left And Right (Always Individual Trees, Even In The Forest) - Recording Of Culverts (Including Material Information, Nominal Widths, Base Heights, Surface Fastenings In Front Of And Behind The Pipe Culverts, Water Level Information, Possible Height Of Siltation: - Other Points (Gw Observation Pipes - Wells And Measuring Points, Also Remote Locations, Existing Fixed Points, Staff And Inclined Levels) - For All Individual Tree Recordings (From D = 10 Cm) Applies: Type And Trunk Diameter, Crown Diameter And Crown Overhang Over Paths, Ditches And Buildings) - Creation Of A Location And Elevation Plan On A Scale Of 1:500; Surveying In The Official Position And Height System - Obtaining And Incorporating The Current Cadastral Boundaries In Dxf/Dwg Files And Shape Files. The Costs Of Procurement Are Borne By The Client. - Handover Of Digital Terrain Model, Close-Meshed Triangular Mesh, Break Edges As 3D Polylines - Documents To Be Delivered (Measurement Protocols (Levels), Measurement Plans And Coordinate Lists Of The Fixed Points; Position And Height P
|