Electrical Installation Work – Modernization Of Lea 110 Kv Jugureanu – Pogoanele, Buzau County. Work Execution: Modernization Of Lea 110 Kv Jugureanu – Pogoanele, Buzau County, Will Be Done According To The Attached Documentation. • Access Road Development And Vegetation Clearing Works: - For The Access Roads, Considering That They Are Country/Unpaved Roads On Certain Sections And Have Unevenness, He Provided Equipment For Straightening (Reducing The Unevenness) Of The Roads In Question In Order To It Had Access With A Concrete Mixer, Crane And Conductive Laying Equipment; - Taking Into Account The Fragility Of The Land In Some Places, The Installation Of Ballast/Sparta Stone Was Foreseen To Make It Possible To Pass With Machines - Deforestation Works Will Be Carried Out In The Corridor Of The Line To Allow Access And Construction Of The Lea 110 Kv Poles; - The Protection Zone Of The Line (Which Coincides With The Safety Zone) Will Be 37 M According To Nte 003/04/00. If The Vertical Height Between The Conductor Closest To The Ground And The Top Of The Shrubs Is Greater Than 4 M, They Will Be Cleared; • Pole Replacement - Damaged Poles And Whose Lifespan Is Far Exceeded, Will Be Replaced With Tubular Metal Poles, With Superior Mechanical Characteristics In Terms Of The Maximum Allowed Distances; - Following The Drafting Of The Survey And The Mechanical Calculation, The Following Pillars Were Dismantled: No. Crt. Type Existing Pillar Number Of Pillars 1. Scs 1165 95 Pcs 2 Ss Ii 110-3-185 2 Pcs 3. Icn 110131 5 Pcs 4. Icn+7 110131 2 Pcs 5. Itn 110142 1 Pc Total 105 Pcs - Following The Mechanical Calculations Made And According To The Data From Sr En 50341 Overhead Electric Lines Of Alternating Voltage Higher Than 1 Kv, It Was Determined That These Poles Will Not Mechanically Withstand The Calculated Tractions, Therefore They Will Be Replaced As Follows: Nr.Crt. Type Projected Pole Number Of Poles 1. Smt Sn 110102 81 Pcs 2. Smt Sn+3 110102 13 Pcs 3. Smt Sn+6 110102 3 Pcs 4. Smt Icn 110113 4 Pcs 5. Smt Icn+3 110113 1 Pc 6. Smt 1Cn +6 110113 2 Pieces 7. Smt Jtn 110114 1 Piece Total 105 Pieces - The Concrete Resulting From Dismantling Will Be Transported To The Nearest Waste Concrete Recycling Station. • Inscription On Poles - Indicators And Security Placards Will Be Mounted On All Poles, And Deforestation Will Be Carried Out On The Corridor, Where There Is Vegetation. • Painting Poles - Rehabilitation/Painting Works Will Be Carried Out On The Poles That Are Not Dismantled - Poles No. 142, 163, 184, 211 And 233, Because At The Moment They Are In An Advanced State Of Rust; - Poles No. Will Be Painted For Daytime Beaconing. 196 And 197 (In Red And White Colors) That Cross A Railway Line (According To Article No. 25 Of Order No. 49 Of November 29, 2007, Which Specifies The Need For Daytime Beaconing Of Poles In Openings That Cross Railways And Roads National). • Pillar Foundations - For All Newly Designed Pillars, Foundations Will Be Made Of Cast Concrete, Monobloc Type (Glass); - The Main Operations For The Execution Of Concrete Foundations Are: • Plotting Pits; • Of
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 77734443
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.