Architectural, Engineering And Surveying Services – Ab Saaledeich Li. Km 0.0 - 3.5 (Draft Measurement). Carrying Out A Design Survey On The Left Main Dike Of The Saale. The Planning Area Is Located South Of The Calbe Saale Ost Train Station. The Dike Section Begins West Of The Railway Line And Continues Along The Left Main Dike Of The Saale (Length: 3500 M, Route Width: Approx. 100 M). In Addition, A New Route (Relocation Of The Dike, Length: 1200 M, Route Width: Approx. 100 M) Is Planned Along An Existing Farm Road. The Following Must Be Carried Out: - Exploration, Marking And Determination Of Position And Height Reference Points (Position Reference System: Etrs89 Utm, Zone 32, Epsg Code 25832, 6-Digit Coordinates Without Zone Code, Height Reference System: Dhhn2016; Exploration And Marking Of Position And Height Reference Points; Distance Approx 500 M, If Possible In The Area Of Access Roads, Ditches And/Or Structures, At The Edge Of The Construction Site, Approx. 10 Pieces; Measurements To Determine The Fixed And Control Points; Evaluation Of The Measurements And Creation Of The Coordinate And Height Directory; Production Of Measurement Sketches; Positional Accuracy : +/- 2 Cm, Height Accuracy: +/- 3 Cm) - Complete Topographical/Morphological Terrain Survey Of Both Routes (Including All Break Edges, Traffic Routes, Buildings, Structures, Enclosures, Pipeline Infrastructure, Vegetation Boundaries, Individual Objects; The Recording Of Types Of Fortifications, Uses, Materials ; Surveying Dike And Road Routes In Cross Sections, Distance Max. 25 M, Smaller In Curved Sections; At Intersections Of Traffic Routes: At Least 50 M Length Of All Traffic Routes, If Necessary Also Beyond The Above-Mentioned Survey Corridors, Including Accompanying Ditches; Pipe Culverts With Base Height, Diameter And Material Type; For Overhead Lines Crossing Dikes, At Least One Mast Must Be Recorded On The Air And Water Sides, And The Height Of The Line Above The Dike Must Be Stated; Recording Of A Sluice In The Summer Dike To Create Sections Including Material Information, Nominal Widths, Bottom Heights, Surface Fastenings; Addition Of Several Sheet Pile Walls To Secure Banks And Embankments; Recording Of Several Dike Crossings; All Trees With A Trunk Diameter At Breast Height Of 0.10 M Or More With Details Of Trunk Diameter And Crown Diameter) - Creation Of A Location And Elevation Plan (Creation Of A Digital Location Model With Selected Elevation Points Relevant To Planning; Creation Of Plans With Representation Of The Situation In The Planning Area With Selected Elevation Points Relevant To Planning; Scale 1: 500 ; Cad Construction In A Sensible Layer Structure, Layer With A Clear Name; Break Edges As 3D Polylines; Incorporation Of The Property Cadastre) - Digital Terrain Model (Selection Of The Elevation Points And Break Edges Describing The Terrain Surface From The Terrain Recording; Dgm Generation Train Taking All Break Edges Into Account) - Photo Documentation (Recording Of Digital Photos; Number: Approx. 50 Pieces) - Procurement Of Property Map (Procurement Of The Digital Property Map From The Responsible Surveying Office; Preparation Of The Current Cadastral Boundaries In Dxf / Dwg File For Transfer To The Lag
|