Bridge Renewal Construction Work – Track Replacement And Renovation Of The Kornhaus Bridge In Bern. - Replacement Order. Track System Including Rail Extensions, Track Drainage, Other Installation Elements. System Change Of Track Superstructure To The Ers From Edilon)(Sedra In The Bridge Area. - Replacement Of High Masts/Contact Lines In The Bridge And Foreshore Area. - Renewal Of Bridge Sealing, Covering And Expansion Joints (Road And Sidewalks). - Renovation Of Bridge Drainage Including Two New Ss At Aare Level. - Two New Cable Routes In The Truss Of The Bridge Slab (Feeder / Nts) Including Suspension. - Steel Construction And Corrosion Protection Work In The Truss Of The Bridge Slab. - Seismic Strengthening Measures On The Specific Bridge Bearings. - New Structure And Track Earthing. - Replacement Of Side Gutters And Drip Noses. - Partial Renovation Of The Natural Stone Of The Pillars - Adaptation/Addition Of Existing Service Lines In The Foreland Areas.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 77485625
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.