Prior Information Notice For Road Construction Works – Redesign Of The Mayor-Wohlfarth-Straße Construction Sections South And North. As Part Of This Call For Tenders, The Redesign Of Mayor-Wohlfarth-Straße Will Be Tendered In Two Sections. The Northern Part Includes The Area Of Mayor Wohlfarth Straße From The Königsallee Roundabout To The Junction With Marktstraße, The Southern Part Includes The Area From The Junction Of St. Johannes Straße To The Römerallee / Blumenallee Roundabout. The Construction Section In The Middle From The Area North Of Gartenstrasse To The Junction With Marktstrasse And The Bus Station Entrance Will Be Completed In Advance. The Two Construction Phases Include Approximately The Following Areas: North Section 6300 M2, South Section 7400 M2 In Both Construction Phases, The Existing Asphalt Roadways And Edging Must Be Demolished And The Asphalt Sidewalks Dismantled. The Frost Protection Layer Must Be Completely Renewed And The Street Drainage Must Be Created Using Trenches Including Upstream Filter Shafts. The Following Structure Is Planned For The Asphalt Surfaces (Load Class Bk 3.2 According To Rsto 12, Table 1, Line 1) 4 Cm Asphalt Surface Layer Made Of Asphalt Concrete Ac 11 Ds, 25/55-55; 6 Cm Asphalt Binder Course Ac 16 Bs, 25/55 -55; 12 Cm Asphalt Base Course Ac 32 Ts, 50/70; 48 Cm Frost Protection Layer. This Results In A Total Thickness Of The Frost-Proof Superstructure Of 70Cm. 40 Cm Soil Replacement Partially Over 1/3 Of The Area With Geogrid To Be Laid At Points Or Concrete Casing Via Cables. Side Areas South And North Sections: Unbound Construction Method Based On Rsto 12, Table 3, Line 1; 12 Cm Top Layer Of Concrete Block Paving With Unbound Joint Filling Light Gray; 4 To 6 Cm Bound Bedding In Accordance With Ztv-Plaster-Stb 06; 25 Cm Gravel Base Layer, Deformation Modulus 150 Mpa On Ok Gravel Base Layer; 29 Cm Gravel Base Layer, Deformation Modulus 120 Mpa On Ok Gravel Base Layer; This Results In A Total Thickness Of The Frost-Proof Superstructure Of 70Cm. Local Public Transport Plays An Important Role On Mayor¬-Wohlfarth¬-Straße. Therefore, Two Bus Stops Were Planned. The Stops Will Be Built With A Structured High Board (Kasseler Sonderbord). The Length Of The Stops Is Expected To Be A Uniform 20M (14.0 M + 2 X 3.0 M Ramp). Services To Be Carried Out: Expanding Bituminous Surfaces (Road And Sidewalk) Approx. 12,000 M2; Expanding Curbs (High And Low Sides) Approx. 1,600 M; Loosening And Disposing Of Soil Approx. 7,500 M3; Producing Road Drains Approx. 80 Pieces; Filter Shaft Dn 1200 Approx. 33 Pieces; Create Frost Protection Layers Approx. 3150 M3; Produce Ats, Abi, Ads Approx. 5150 M2; High/Low Curb As Natural Curb Approx. 1,700M; Create A Top Layer Of 12Cm Concrete Paving Approx. 7,500 M2; Large Granite Paving Channel In 3 Rows Approx. 1,250M
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 77337297
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.