Air Conditioning Systems For The New Construction Of An Indoor Shooting Range In An Existing Property: 1 Piece Ventilation System. With Humidification And Heat Recovery At 84,800 M3/H; 1 Piece Ventilation System. With Humidification And Heat Recovery At 54,200 M3/H; 1 Piece Ventilation System. With Heat Recovery At 6,440 M3/H; 3,400 M2 Of Air Duct, Galvanized Duct And Stainless Steel; 40 Pcs Duct Silencers; 48 Pieces Of Fire Dampers; 1 Piece Mechanical Smoke Extraction 40,000 M3/H; 1 Piece Mechanical Smoke Extraction 20,000 M3/H; 2 Pieces Of Mechanical Post-Flow Using Axial Fans; 130 M2 Supply Air Wall For Room Shooting Ranges; 26 Pcs Exhaust Air Outlet Grilles With Filter Cell For Exhaust Air Bullet Trap; 1 Piece Of Lead Dust Extraction Up To 5,000 M3/H; 1 Piece Outdoor Exhaust Air Chimney Dn 2300, H: Approx. 14 M; 1 Piece Outdoor Exhaust Air Chimney Dn 1800, H: Approx. 14 M; 1 Piece Liquid Cooling Set Cooling Capacity Approx. 25 Kw, Buffer Storage 850 L, Plate Heat Exchanger And Dry Cooler As A Dry Cooler Approx. 30 Kw; 9 Pieces Of Cold Water Circulating Air Cooling Units; 800 M Cold Water Steel Pipe; Trial Operation; Exchange Of Information On Building Automation.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 77278795
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.