Tenders Are Invited For Refuse-Incineration Plant Construction Work – Realization Of The Deslagger, Shaft An ...
Tender Notice
TenderID
77027396
Tender Brief
Tenders Are Invited For Refuse-Incineration Plant Construction Work – Realization Of The Deslagger, Shaft And Transport System (Bottem Ash Handling System) Of Combustion Lines 1 And 2, And Optional Line 3.
Refuse-Incineration Plant Construction Work – Realization Of The Deslagger, Shaft And Transport System (Bottem Ash Handling System) Of Combustion Lines 1 And 2, And Optional Line 3.. Initial Assignment: 1. Design ( Engineering ) And Construction ( Manufacturing, Delivery And Assembly) For The Replacement Of The Shaft And Deslagger Of Combustion Lines 1 And 2. The Battery Limit Of The Initial Assignment: From The Throw-Off Of The Grille, The Connection Of The Shaft To The Bottem Ash Handlingystem (Transfer Channel) Of The Grille, To The Ejection Opening In The Deslakker Bunker, Adjustments To Platforms And Penetrations, E&I, Control And Hydraulic Facilities For The Correct Functioning Of The New Installation Parts; 2. Associated Documentation In Accordance With Twence Requirements Lines 1 And 2; 3. Maintenance Of 2 Years During The Warranty Period And A Period Of 2 Years After Warranty Period For Lines 1 And 2. 4. Optimizing Semi-Dry Operations: Such As Eliminating Dust Emissions, Wear Reduction And Temperature Control; 5. Design ( Engineering ) And Construction ( Manufacturing, Delivery And Installation ) Transport System Of The Bottom Ashes After Ejection Of Deslaggers For Combustion Lines 1 And 2; 6. Design ( Engineering And Advising ) And Construction ( Manufacturing, Delivery And Installation ) Of The Slag Chute Gate Valve In The Shafts Of Lines 1 And 2. Optional Assignment 1. Design ( Engineering ) And Construction ( Manufacturing, Delivery And Installation ) For The Replacement Of The Shaft And Deslagger Of Combustion Line 3. The Battery Limit Of The Optional Command: From The Throw-Off Of The Grille, The Connection Of The Shaft To The Bottem Ash Handlingystem (Transfer Channel) Of The Grille, To The Ejection Opening In The Deslakker Bunker, Adjustments To Platforms And Penetrations, E&I, Control And Hydraulic Facilities For The Correct Functioning Of The New Installation Parts; 2. Associated Documentation In Accordance With Twence Requirements Line 3. 3. 2-Year Maintenance During The Warranty Period And 2 Years After The Warranty Period For Line 3; 4. Transport System Of The Bottom Ashes After Ejection Of Deslaggers For Combustion Lines 3; 5. Design ( Engineering And Advice ) And Construction ( Manufacturing, Delivery And Installation ) Slag Chute Gate Valve In The Shaft Of Line 3.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 77027396
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.