Feasibility Study, Advisory Service, Analysis – Monitoring Of Wetlands Bordering The Avesnes-Sur-Helpe Bypass Work Zone (Rn2). • Phase 1: Creation Of An Initial State Before Work On Wetlands. This Initial State Will Be Carried Out On The Basis Of Soil Surveys And A Flora/Habitat Inventory Whose Sampling Plans Have Been Validated By The Instructing Services. • Phase 2 And 3: Annual Monitoring Of Wetlands. This Monitoring Will Be Carried Out On The Basis Of Pedological And Floristic Criteria. It Will Be Carried Out During The Entire Period Of Work. Each Year, An Annual Report On The Evolution Of Wetlands Will Be Provided. For Each Phase, A Report Including The Results Of Field Investigations And The Associated Cartography In Gis Format Will Be Provided. The Results Will Be Presented At A Meeting. • Phase 4: Annual Monitoring Of Wetlands In The Same Way As Phase 2 And An Assessment Of The Evolution Of The Sampled Points (Upon Commissioning).
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 77026727
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.