Tenders Are Invited For Works Related To Water-Distribution Pipelines - Mm-Cl-05 - Design And Execution (Inc ...
Tender Notice
TenderID
76959743
Tender Brief
Tenders Are Invited For Works Related To Water-Distribution Pipelines - Mm-Cl-05 - Design And Execution (Including At From The Designer According To Law 10/1995) - Drinking Water Transport System Baia Mare - Tautii Magheraus-Cicarlau-Seini
Works Related To Water-Distribution Pipelines - Mm-Cl-05 - Design And Execution (Including At From The Designer According To Law 10/1995) - Drinking Water Transport System Baia Mare - Tautii Magheraus-Cicarlau-Seini. The Contract Includes Design, Execution And Technical Assistance From The Designer For The Objective Mm-Cl-05 - Design And Execution (Including Ta From The Designer According To Law 10/1995) - Drinking Water Transport System Baia Mare - Tautii Magheraus-Cicarlau-Seini For: • Srtap Baia Mare - Seini: -Baia Mare - Seini Regional Potable Water Transport System - L=40,643M - Potable Water Storage Tank 300 Mc_Sasar; -Sasar Pumping Station -Sasar Chlorination Station -Reservoir 300 Mc_Tautii Magheraus -Tautii Magheraus Chlorination Station -Drinking Water Storage Tank 2X500 Mc_Ilba -Ilba Chlorination Station -Drinking Water Storage Tank 2X500 Mc_Seini -Seini Pumping Station -Seini Chlorination Station -Rehabilitation (Re-Engineering) ) Existing Reservoir 2X200 Mc - Ardusat The Contract For The Design And Execution Of The Objective Mm-Cl-05 - Design And Execution (Including At From The Designer According To Law 10/1995) - Drinking Water Transport System Baia Mare - Tautii Magheraus-Cicarlau-Seini Includes: A) The Design Activities - The Technical Execution Project, Which Will Include All The Documents Required According To The Legislation And Any Documentation Necessary To Obtain The Approvals And Authorizations; Support For The Beneficiary In Obtaining The Necessary Authorizations And Approvals; B) Construction Works; C) Supply And Installation Of Machinery And Technological Equipment; D) Testing And Commissioning; E) Training Of The Beneficiarys Staff. F) Fixing Any Defects That Appeared During The Warranty Period. G) During The Execution Of The Works, The Contractor Will Also Provide Technical Assistance From The Designer, With All The Legal Attributions That Fall To Him For This Purpose. The Duration Of Design And Execution Of The Works And Commissioning Of The Installations Is 33 Calendar Months, Broken Down As Follows: - Design Stage: 6 Calendar Months - Period Of Execution Of The Works: 24 Calendar Months - Testing And Commissioning Period: 3 Calendar Months The Defect Notification Period (Pnd) Is A Minimum Of 36 Calendar Months From The Signing Of The Acceptance Report To The Completion Of The Works.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 76959743
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.