Horticultural Services – Greenery Care And Maintenance Services In The Warsaw Citadel At Ul. Dymińska 13 In Warsaw. Scope Of Greenery Maintenance Works In The Warsaw Citadel Ul. Dymińska 13 With A Total Green Area Of 5.7 Ha 1. Maintenance Of Green And Flowering Plants In The Area Around Buildings No. 5 And 6, Along The Streets Of Ul. Gwardii, Ul. Priest Ściegiennego And Ul. Convicts And Around The Military Chapel, Building No. 26, Area 38,000 M² - Maintaining Greenery (Various Green And Flowering Plants) Along The Streets And At The Back Of Buildings 5 And 6; - Weeding And Removing Weeds And Self-Seeded Plants (Ongoing Throughout The Entire Growing Season Of Plants); - Fertilization According To The Growing Season; - Tree Care Throughout The Area, Maintenance And Sanitary Cuts - 60 Pcs; - Constant Monitoring Of The Health Of Trees And Shrubs (Fighting Diseases And Pests), Placing Sticks And Pheromone Traps On Chestnut Trees - 40 Pieces; - Removal Of Broken Branches After Storms And Winds; - Regular Replenishment Of Places After Drying (Death Of Plants), Planting Shrubs, Reseeding Grass; - Pruning And Caring For Bushes And Ad Hoc Watering Of Greenery To Prevent Drying Out During Periods Of Drought Using Your Own Equipment; - Raking And Removing Leaves And Chestnuts From The Indicated Area At Least Once A Week In September - November; - Removal And Removal Of Leaves From Lawns After Autumn 2023 In April 2024 - Mowing And Removal Of Mowed Grass Twice A Month In April - October 2024; - Lawn Regeneration, Reseeding Grass In Damaged Areas, Fertilizing And Leveling The Lawn Surface; - Establishing 30 Flower Beds With Dimensions Of 4 M² And Planting Annual Plants In Them, Their Subsequent Care In The Period April - September 2024 - Placing Flower Beds Evenly Along The Streets: Ks. Ściegiennego, Gwardii, Levitoux, Fatory To Bitna Street (Tagetes, Begonias, Chinese Aster, Zinnia, Celosia, Impatiens, Verbena); - Replacement Of Damaged Heather And Ongoing Care (Along Gwardii Street); - Establishment Of A Flower Meadow, Care, Fertilization (Approx. 500 M2) Around Building 26 And Along The Wall; - Cutting Down Dead Trees (After Obtaining The Consent Of The Conservator), Milling Stumps. 2. Maintaining The Proper Condition Of Greenery On The Roofs Of Buildings (Casemates) In The Warsaw Citadel, Area Of 8,450 M² - Mowing Grass And Removing Self-Seeded Trees From The Roofs Of Casemates No. 37, 46, 50, 57, 60 And From Low Earth Embankments Running Along Ul. Farzy - Once A Month In The Period April - November 2024. 3. Maintaining The Proper Condition Of Greenery Around Building 65, Area 4,800 M² - Mowing And Grass Removal In April - November 2024; - Supplementing, Overseeding And Fertilizing The Grass; - Constant Monitoring Of The Health Of Trees; - In The Months Of April - November 2024, Raking And Removing Leaves, At Least Once A Month; - Trimming And Tidying Up Bushes Along The Citadel Wall, Approximately 150 M; - General Tidying Up Of The Area. 4. Maintenance And Renovation Of The Area Along The Eastern Side Of The Street. Farzy Area 1,700 M² - Watering, Supplementing, Overseeding And Fertilizing The Grass; - Mr
|